My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12988267
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
16-XXXXXX
>
12988267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 8:00:12 PM
Creation date
7/31/2025 10:08:02 AM
Metadata
Fields
Template:
Permits
Permit Address
10790 MAIN ST NE
Permit City
Donald
Permit Number
555-16-004010-STR
Parcel Number
041W17CA06000
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ib jP CAPPING HIP AND RIDGE <br /> / Use Shadow Ridge for covering hips and ridges.There are 24 <br /> C / three-piece units in each Shadow Ridge bundle,that will cover <br /> 30 linear feet(33 Y4 linear feet,Metric) Each English dimension <br /> u°ae`vm\ fa <br /> cap piece is 12 by 1Z <br /> � <br /> AYa <br /> \\,� ,,�e y� �� Fjqure l]-8 <br /> �a�; -jaw* �oaoc ° SHADOW RIDGE APPLICATION <br /> tied nrsaci,'°'t', �orE.s• Use two nails to fasten each shingle.Apply a starter piece dial has the <br /> \a`'a `�� y'6dp°. bottom 5'removed.Fasten the starter with two nails located about 3" <br /> 1tl* from the rake edge,and 1'in from each side edge.Apply a full cap <br /> \re shingle over the starter and place fasteners at 5-5'8"up from <br /> 2pa the exposed bottom edge and 1"in from each side. <br /> Figure 11-7.''Applying the first 7 courses on a stan&adsiope. 17 jJ <br /> (SpSm Over <br /> m)�"I Apply <br /> Shingle <br /> 3RD THROUGH 7TH COURSES:Cm 10"(254 tom)off the first I' //,,/. <br /> shingle of the third course,and install the renaming piece over and VI., //' <br /> above the second course shingle;cut 15"(381 mm) off the first <br /> shingle of the fourth course,and install the remaining piece over and I I Starter Shingle <br /> above the durd course shingle;cut 20"(508 mm) off the first shingle I r I <br /> of the fifth course,and insult the remaining piece over and above \<(itMa+o)� <br /> the fourth course shingle;cm 25"(635 mm)off the first shingle of I rj/ 1c <br /> the sixth course,and install the remaining piece over and above the /�/�I'/i• <br /> fifth course shingle;cut 301762 mm)off the first shingle of the <br /> seventh course,and install the remaining piece over and above the <br /> sixth course shingle.install full shingles flush against the seven <br /> applied courses. <br /> SUCCEED1N6 COURSES:As you go up the rake,repeat the same <br /> 2' <br /> pattern used to start the first seven courses.Finish the courses with 0054"nu <br /> funshingles,working from the eaves up the roof. . Laying road` <br /> /%/ <br /> 4. <br /> Note:Patriot shingles canalso be applied using a 7 Course <br /> 5-5iS"Stepped-Off Diagonal Offset,a 6 Course, • .''I <br /> 6"Stepped-Off Diagonal Offset or a 5 Course, I I <br /> 7' Stepped-Off Diagonal Offset. 5..41251fimI I I _---- <br /> Exposure I <br /> Note:When applying Patriot shingles using a Diagonal Offset �1li <br /> Melbnd,donot start a course will a shingle piece that has a length F 1�Js <br /> drat is less than the offset dimension being used (5",6" or 7"). - <br /> (English Dimensions Shown) <br /> Figure 11-9 <br /> 106 Chapter ll CERTAINTEED SHINGLE APPLICATORS MANUAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.