My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12987539
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
17-XXXXXX
>
12987539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:00:12 PM
Creation date
7/30/2025 4:41:38 PM
Metadata
Fields
Template:
Permits
Permit Address
13773 SILVER FALLS HWY SE
Permit City
Sublimity
Permit Number
555-17-005840-STR
Parcel Number
081W14 00600
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tI C'O Worldwide <br /> Fire Protection Contacts www.tyco-tire.eom <br /> Products <br /> QUELL <br /> Preaction and Dry Systems <br /> For Eliminating In-Rack Sprinklers <br /> Table of <br /> Contents <br /> Sections A^* #k rt x <br /> Training 1 <br /> General Description 1 <br /> Technical Data 3 System Components 3 fitta �`! <br /> Design Criteria 4 <br /> Operation 11 r 4 <br /> Installation 12 Y 41J 1t• n - <br /> Care&Maintenance 12 "On 'f:fik <br /> Limited Warranty 12 fj }t11Yassaq.. <br /> Ordering Procedure 12 '' a kind UL <br /> Fire <br /> I <br /> Test <br /> Report App.A(4/07) rs xalit ;�. <br /> FM Fire Test C r't5frir <br /> Summary App. B(3/09) y ' <br /> UL Fire Test t t <br /> Report <br /> (48'Ceding + 4 <br /> Class II 8 Ill) App.C(4/07) <br /> UL Group A Training General <br /> TestFne tded Plastic <br /> Fire Tes Report App.D(4/07( <br /> Training provided by Tyco Fire <br /> UL Group A Protection Products (TFPP) is Description <br /> Unexpanded Plastic mandatory prior to bidding,designing, The TYCO QUELL Preaction and Dry <br /> Test <br /> Fire Test Report App. E (4/07( procurement of components, instal- Systems are an innovative approach <br /> Tables lation, and maintaining of the TYCO to addressing a high-challenge fire <br /> QUELL Preaction and Dry Systems hazard that departs from previous <br /> Class II Storage 5 These systems are unique in their control mode and suppression mode <br /> Class III Storage 6 intent and design.Anyone involved at approaches for addressing high-chal- <br /> Class IV and Group A Plastic any level must thoroughly understand lenge fires, and instead employs a <br /> Storage 7 the Iirnitations and capabilities of such sprinkler operational area sufficient to <br /> systems. surround and drown a high-challenge <br /> nu Pressure Setting . 10 fire. The QUELL Preaction and Dry <br /> Systems provide an alternative method <br /> Figures of protecting high challenge storage <br /> Piping Schematic 2 without the need for in-rack sprinklers. <br /> Electrical, The elimination of in-rack sprinklers <br /> Preaction System 8 avoids the greatest potential of inad- <br /> Electrical. vertent operation caused by mechan- <br /> Elle System g cal sprinkler and piping damage during <br /> loading and unloading of racks. Due <br /> Ultra K17 Sprinkler 10 to the non-water filled piping of the <br /> QUELL Systems, those systems are <br /> especially advantageous for refriger- <br /> [ ated and cold storage. <br /> �r Page 1 of 12 NOVEMBER 2014 TFP370 <br />
The URL can be used to link to this page
Your browser does not support the video tag.