Laserfiche WebLink
22 <br /> 4.8 Diayramminz the First Three steps to start Wallform lav-up--Critical to orient the <br /> corners correctly! <br /> 4.8.1 Step <br /> Lay the corners first on the footing at exact locations. Note the orientation of the corners on <br /> diagram! This insures that the tongues and grooves mate properly on every course. It doesn't <br /> matter whether the process starts with the notched side up or down on the footing. Illustration <br /> shows notch down. <br /> Starting point;work clockwise <br /> • <br /> Len <br /> El <br /> Inside corners-Note that they N/ <br /> come with a different insulation <br /> arrangement than the outside <br /> corner. <br /> 1;1; <br /> Nei <br /> ❑ ®l <br /> ShelterWorks General Application and Technical Information(GATT)version 2.5 <br />