My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12986249
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
12-XXXXX
>
12986249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 8:00:11 PM
Creation date
7/30/2025 9:43:53 AM
Metadata
Fields
Template:
Permits
Permit Address
6203 SHAW LN SE
Permit City
Aumsville
Permit Number
555-12-05259
Parcel Number
082W24A 00800
Permit Type
1 & 2 Fam Dwelling (New Only)
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17 <br /> L <br /> 4.2 Concrete in-fill approximate volume <br /> Wallform with 3" Insulation Insert: .333 cubic feet per square foot of wall area <br /> Wallform with no insert: .5185 cubic feet per square foot of wall area <br /> Reminder: The AP wall form is not notched for the horizontal core. This has to be done at <br /> the jobsite to fit the situation.Two cuts with a saw are sufficient to knock the center piece <br /> out with a hammer. A reciprocating saw is the recommended tool for this,or a circular <br /> saw. <br /> Faswall®Wallforms MUST be filled with concrete;they are not designed to be stand-alone load <br /> bearing concrete masonry units. Mortar should be used only as a bed for leveling the first course <br /> of wall forms on a footing or slab that is uneven. Alternatively plastic shims may be used to level <br /> the first course(see 3.7). <br /> 4.3 Receiving and Unloading Wallforms <br /> Carefully unload the wall form pallets from the truck using a pneumatic tired forklift. Be <br /> careful in traversing rough terrain with pallets of wallforms as they can tip if severe <br /> rocking occurs. Place them on level ground close to the jobsite where they will be used.When <br /> unloading by hand,you should use caution and avoid reckless handling of the wall forms. <br /> Check each pallet for wallforms that may have been damaged in shipment.After examination of <br /> the shipment set aside on a separate pallet any wallforms that have been cracked or broken and <br /> are not safe for use. It is important to notify the manufacturer so that arrangements can be made <br /> for the replacement of any damaged wall forms. <br /> All damages to Faswall®products should be noted on the trucking company's delivery ticket <br /> and the driver should verify the damage and sign the papers before the truck leaves the jobsite. <br /> Claims for damaged products should be made promptly and the manufacturer should be made <br /> aware of the claim. <br /> ShelterWarffi General Application and Technical Information(GATT)version 2.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.