Laserfiche WebLink
• <br /> 4h ., Marion County Building Inspection Division <br /> O R E G O N On-Site Septic Review <br /> ea_ PUBUC WORKS <br /> Permit Number: 03-07402 Date: September 22,2003 <br /> Project Address: 213.38 NE Oak Lane,Aurora,OR <br /> Completed By: Danielle Alesbire,Onsite Watewater Specialist <br /> SEPTIC AUTHORIZATION I MAJOR ALTERATION <br /> The septic system alteration has been sized for 499 public visitors.which will create a potential sewage flow of <br /> 2,495 gallons per day. Dupla pumps and an effluent screen are required. Refer to the signed approvedsiteplan <br /> dated September22,2003. Also,refer to the system specifications on page 2 of theperndt document <br /> ADETAII.ID SEPTIC SYSTEM STAKEOUT IS REQUIREDpriorto the issuance of a septic syseuiinstallation <br /> ye„uit The area forte system is very limited and the stalceoutmostbe completed to determine that the system will <br /> fit within the area of the aypaovcd test pits.A scale dawn,detailed site plan must b submitted with the application <br /> for the installation permit The C*eout must be inspected on the property and approved before the permit can be issued.Instructions for the stakeout are attached and are available in our office. `is) <br /> DUPLEX hFFLUENT LIFT PUMPS WILL BE REQUIRED to install the septic system disposal field in the <br /> appoved area and at the required depth.Detailed instructions for dosing tank/effluent pump p installations are <br /> available in our office. The electrical wiring to the pimp and alarm must be installed in accordance with the <br /> siruy:Isle Electrical('nine-The electric work must be done under a Marion County Electrical Permit and must <br /> be inspected and approved by a Marion County Electrical Inspector. The work mast be left uncovered and <br /> accessible for inspection.The electrical inspection includes the connections to the pump and alarm in the dosing <br /> tank,the wiring in the trench and the connections in the stnu:nna <br /> OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by the DEQ rules The well <br /> placement is especially critical and must be located at least once-hundred(100)feet from the approved initial and <br /> replacement DLA)NPIELD areas.A copy of the DEQ setback requirements is available in our office. <br /> 11ib APPROVED SEPTIC SYSTEM ARE A MUST BE PROTECTED from any vebiculartraffic,-livestock mad <br /> farming activities. Other activities such as logging, excavating or filling, driveway placement or any similar <br /> activities may also damage the soil in the area and adversely affect the septic system approval.The areas of the <br /> initial septic system and the future repair system mmst both be protected. <br /> TILLS SYSTEM MUST BE INSPECTED AND APPROVED PRIOR TO BAC%FILL When work is complete <br /> and ready for inspection,call our AutomatedlnspectionRequestline at(503)373-4427 to request an inspection. <br /> Enter the number"801"for a PR A.-COVERInspectice.You may leave a message for the inspector if desired.Be <br /> sure the System Record f®with the AS-Built drawing is on the job or in our office when the inspection is <br /> requested.An inspection should be completed within seven(7)days. <br /> J <br /> 555 CoutSt-NE— P.O.Box 145a0—Salem Ortpn 973093036—Phcae(503)338-3147—Paz(303)538-r948 <br /> Page 1 out <br />