My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12982108
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
13-XXXXX
>
12982108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:00:13 PM
Creation date
7/29/2025 1:38:40 PM
Metadata
Fields
Template:
Permits
Permit Address
2836 BRANDI LN SE
Permit City
Jefferson
Permit Number
555-13-005648-STR
Parcel Number
093W36C 01000
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bureau of Development Services <br /> Program Guide- Solar Water Heating and Photovoltaic Electric Generators <br /> Installed on One or Two Family Dwellings <br /> Page 8 of 14 <br /> December 1, 2010 <br /> Submittal Requirements <br /> In addition to requirements for standard installations, solar <br /> installation permits utilizing S-5-U Mini Clips shall contain the <br /> following additional information: <br /> 1. Roof framing plan indicating framing member size and spacing, <br /> type of roofing, roofing attachment of metal roofing to framing, <br /> location and spacing of S-S-U Mini Clips. <br /> 2. Structural calculations demonstrating that uplift demand on the <br /> S-5-U Mini Clip is less than allowable uplift load. <br /> VI. INSPECTIONS <br /> The following inspections will be required for the installation of the solar system: <br /> A. Building <br /> Building inspections are required to verify that the solar support system is <br /> properly installed. For alterations, two building inspections, listed in order, are <br /> 411, required to verify that the system has been installed properly: <br /> 1. IVR Code 299: Final Structural <br /> 2. IVR Code 999: Final Building. <br /> For new construction or for permits that include additional work beyond the <br /> installation of the solar system additional inspections may be required. <br /> B. Plumbing <br /> A plumbing inspection is required where the solar apparatus attaches to the <br /> potable water system, usually a water heater. The inspection will verify that the <br /> collection system is properly attached so that no contamination of the potable <br /> system can occur. Two plumbing inspections, listed in order, are required to <br /> verify that the system has been installed properly: <br /> 1. IVR Code 340: Water Heater <br /> 2. IVR Code 399: Final Plumbing. <br /> C. Electrical <br /> An electrical inspection is required in all instances where the solar system <br /> provides power to the dwelling electrical system. The inspection will verify that <br /> the circuits and feeders have been installed properly and the system has been <br /> connected properly. Three electrical inspections, listed in order, are required to <br /> verify that the system has been installed properly: <br />
The URL can be used to link to this page
Your browser does not support the video tag.