My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1294853
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
95-XXXXX
>
Permit - 1294853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2011 1:21:58 PM
Creation date
9/4/2003 12:58:37 PM
Metadata
Fields
Template:
Permits
Permit Address
14664 KASEL CT NE
Permit City
Aurora
Permit Number
555-95-15477
Parcel Number
041W12CB02400
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DIRECTOR <br />Craig O, kuedeman <br /> <br />BUILDING INSPECTION <br />{503) 5~-5~47 <br /> <br />F~NNIN~ & <br />~NFORC~ENT <br />~50~) 5~- 50~8 <br /> <br />~OARD OF <br />COMMI~IONE~ <br /> Randall ~ranke <br />Gary Heer <br /> ~a~y P~atmlne <br /> <br />ADMINIST~ATI~ <br /> OFFICER <br /> Ken Roudybush <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br /> DEPARTMENT <br /> <br />September 3, 1993 <br /> <br />TO: <br /> <br />Rudi and Annette Kasel <br />14675 Kasel Court NE <br />AurOra, oregon <br /> <br />FROM: <br /> <br />Robert Foster, RS <br /> <br />SUBJECT~ Addendum to subdivision approval <br /> Kasel Court Subdivision, Phase 2 <br /> <br />This addendum is to clarify the requirements for issuance of on-cite <br />cewage cyctem permits for the lots in the above cubdivision. <br /> <br />All conditions crated in my April 25~ 1991 letter of approv- <br />al must be met. <br /> <br />In addition, a stakeout of the house and septic system on <br />each lot must be completed prior to icsuance of any septic <br />permits. The stakeout must be completed in accordance with <br />the attached instructions. The hc~se site must be placed on <br />the 10t after both the initial and replacement septic <br />systems have been physically staked out on the property. <br />Remember that any excavation work downslope of the septic <br />system and in excess of 30 inches deep will require a 25 <br />foot setback to the septic system. An inspection will be <br />made of the property after each stakeout is completed and <br />before each septic p~rmit is issued in the subdivision. <br /> <br />Please submit a cody of the final plat of the subdivision to <br />our office. This should reflect the changes in property <br />lines and changes in numbering that have taken place since <br />the preliminary plat wac submitted for evaluation. <br /> <br />Please call our office if you have any questions, Our hours are 8:00 <br /> <br />Senator Building - 220 High Street NE Salem, Oregon 97301-3670 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.