Laserfiche WebLink
APPENDIX A <br /> <br />FIELD INVESTIGATION <br /> <br />Two soil borings were advanced at the approximate locations shown on the Site Plan (Figure <br />2). The work was performed June 20, 1995 under the direction of a geologist from our firm. <br />The borings were advanced using a trailer-mounted drilling rig equipped with 4-inch <br />diameter solid-stem augers. <br /> <br />Samples of the subsurface materials were collected using a standard split spoon sampler <br />(1V2-inch inside diameter, 2-inch outside diameter). The sampler was typically driven 18 <br />inches into the materials at the bottom of the boring using a 140-pound hammer falling 30 <br />inches. Disturbed samples were obtained from the split spoon sampler, sealed in plastic <br />bags, and returned to our office for examination. <br /> <br />The locations and elevations of the soil borings are approximate and were estimated using <br />the site plan provided to us by GTE Mobilnet. <br /> <br />The soils encountered in the borings were described using the Un/fled Soil Classification <br />System summarized in Table A-1 and using the soil descriptors discussed in Table A~2. <br />Final logs of the borings are presented as Figures A-1 and A-2. <br /> <br /> <br />