Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE * Room 132 * Salem, Oregon 97301-3670 <br />Office Heurs: 8:00-4:30 · Phons: (503) 588-5147 * 24-HR Inspection Line: (503) 588-7904 <br /> <br />::F'I~RHZT NO <br />:TYPE <br /> <br /> DaELL~NC PERmiT <br />~ ~4/~5/95 16=22 STATUS <br />= 9~-I~888 APPLIED = ~3/~7/1995 <br />: Ne~ S~ngle Family D~e~lt~g ISSUED <br />: 1-Family ~wellin~e oe~acned TO EXP[RE <br /> <br />In seismic ~one ~ water heaters shall be anchored or <br />strapped to resist h~rizontal d~,splacement due to <br />~arthquake motion. (F-,l~ilO (e)) <br />Smeke detectors shall be install, ed outside of each separate <br />sleeping area in the immediate vicinity of the bedrooms and <br />on each additional story of the dwelling including <br />basements. All detectors shall be i~terconnected such that <br />the actuation of one alarm will actuate all the alarms <br />the individual unit and shall provide an alarm which will <br />be audible in all sleeping areas. (R-215.1) <br />The BCi floor ~oist system shall be installed in accordance <br />wAth its listing and the manufacturer's installation <br />instructions. Please have the in:tsllation~ ~ ;~nstruct"on.~ <br />available during the framing inspections. <br />This house plan uses a combination of Brace PanelLs (BP). <br />A}ternate Brace Panels (ABP) and an Engineered Design (Shear <br />walls) to meet the code requirements for lateral wall braci <br />rig. Insure that all BP~S, A~P'5 and Shear Walls are located <br />as indicated on the plans~ <br />Roof trusses are required to be desigmed by an Oregon <br />registered Enqioeer or Architect. ?or trusses maniifactured <br />by'an approve8 fabr'icatJon plant, have the design and <br />layout drawings available at the construction site for the <br />framing inspection. All job site cutting or modification <br />of the roof trus~ms shall b. clearl~ shown in the <br />en~meer~s design calculations and drawings. If trusses <br />are to be built at the dob site~ submit the engineer's <br />design and construction @la~s to the Nation County Building <br />Department prior to start of c)n_,troction and have th~. <br />approved drawings available at the s:ite for the framing <br />inspection. <br />Energy Path ~1 is based on R-21 wall insulatton~ <br />underfloor insulation~ R-3e v~ulted ce[l~ng insulation~ R- <br />38 flat ceiling insulation~ R 21 basement malls. R-15 slab <br />floor edg~ fnsulatton~ R-8 forced air duct insulation. 0.~0 <br />U-value ~ndow clas.,~ 0.5~ U-value skylight class~ ~.~4 <br />vaiLue main entry door with a Maximum of ~4 square feet and <br />8.28 U-value doors~ other than the main entry <br />(including the door between the heated dwelling and the <br />unheated garage). <br /> <br /> <br />