Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 * Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 * Phone: (503) 588-5147 · 24-HR Inspection Line: (503) 588-7904 <br /> <br />DATE/TItlE <br />PERHIT <br />TYPE <br />CLiffS <br />O~UP~MdCY <br /> <br /> O~ELLING PEF~IT <br /> : ~4/~$/95 17:21 STATUS : ISSUED <br /> ; 95-1~Y76 APPLIED : &3/87/19~5 <br /> : Hee Single Faaily Dwelling ISSUED : e4/S5/1775 <br /> c 1-Feaily Oeelling, detached TO EXPIRE <br /> c R-3 PaGE 3 <br /> <br />~?,, In ~e~sm~c zone ~ water heaters shall be anchored or <br /> strapped to resist horizontal displacement clue to <br /> ~arthquake mote. on. (P~-I~10 (e)) <br />l~. ~moke detectors shall be installeO outside of each separate <br /> sleeping area in the immediate vicinity of the bedrooms and <br /> on each additional story of the dwelling including <br /> basements. AIl detectors shall be inteY'connected such that <br /> ~he actuation of one alarm will actuate all the 81mrms in <br /> the iodividuol unit and shall provide an alarm which will <br /> be audible in all sleeping arems. (R-21~.i) <br />~4. The BOI floor joist system shall be installed in accordance <br /> with its listin and the manufacturer's installation <br /> instructions. ~lease have the i~stallation instructions <br /> avail~ble during the framing inspections. <br />1~. Th~.s house plan uses a combination of Brace Panels (BP), <br /> Alternate Brace Panels (ASP) and Engineered Design (Shear' <br /> Walls) To meet the code requirements for ~ateral wall <br /> bracing. Insure that all BP'S, ABP'S and ~hear walls are loc: <br /> ated a~ indicated on the plans. <br />:L6. Roof trusses are required 'to be designed by an Oregon <br /> regJ. stered Engineer or.Architect. For trusses manufactured <br /> by an approved fabrication ~la~t, have the des:i, gn and <br /> layout drawings available at ~he constr~tction szte for the <br /> fraM~og inspection. All dob site c~ting or modifica'~ion <br /> of the'roof trusses shall be clearly shown in the <br /> engineer's design calculations a~d drawings. If trusses <br /> are to be built at the ~ob site~ submit the engineer's <br /> design and construction plans rathe Marion County Building <br /> DepaEtment prior to start of conmtruction and bare the <br /> gpproved drawings available at the site for the framing <br /> s~spection. <br />17. EnergZ Path ~1 is based on R-21 Wall in~ulation~ <br /> u~de~f~oor insulatio~, R-3B va~l~ed cei~,ing insulation, <br /> 58 fla~ ceiling insuzation, R-21 basement walls, ~-15 slab <br /> floor edge insulation, R-B forced air duct insulation, 0.40 <br /> U-value windo~ class, ~.50 U-value skylight class, 0.54 U- <br /> vai~ue main entry doer w~th a MaXimum of ~4 square feet and <br /> 0.~0 U-value doors~ other than the main entry <br /> (including the door betweem the heated dwelling and the <br /> unheated garmge). <br /> <br /> <br />