Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 * 24-HR Inspection Line; (503) 588-7904 <br /> <br /> 81.1XLS~NG PERHIT <br />9~TE/TZflE = ~5/1&/~5 S7=58 <br />PERHIT NO .= 95-11332 <br />TYPE <br /> . i[ Cv.merc. iel- -- <br /> addition/a Iteration <br />!CLASS - . SCheO1, Educational Building <br /> El <br /> <br />STATUS = ZSSUED <br />APPL[£D : S~/29/1795 <br />ISSUEP = ~5/16/1795 <br />TO EXPIRE = 11/12/1975 <br />PAGE 2 <br /> <br />COMMENTS !AND CONDI'rlONS <br /> <br />REQUIRED SETBACKS: Front: Left: Right: Rear: Special: <br /> <br /> ~.. ApprovalofsubMitted plans is not an approval of omissions <br /> or oversights b~ ~his office or of noncompliance ~ith any <br /> applicable re§u~a~iens of local §OvernMent. <br /> 2. Approveo address numbers shal! be~:painted or affixed to the <br /> front of the butld~ng in a contrasting and highly visible <br /> cozor~ not less than six (6) inches in height for <br /> commercial ueeor four (4) inches:!in heiqh~ for residential <br /> use. TEe numbers shall be affixed?~rior ~o final <br /> i~mpection. (51~) (UFO 10.$01) (oRe 774) <br /> 3. A roadside Marker shall be placedi~at the access point with <br /> address numbers in a contrasting a:nd I~ighly visible color, <br /> not less than five (5) inches in,height for coMMercial use, <br /> or three (3) inches in height formesidential use. <br /> 4. The INSPECTION RECQRB GEEER CARD Shall be posted in <br /> visible ~nd readily accessible lociation throughout . <br /> construction. APPROVED CONSTRUCTION PLANS shall be ~ep't on <br /> the site of the buildin~ or ~ork at the time of inspection. <br /> 5. Wore May proceed only a~ the direction of the inspector, <br /> TO ~equest aM i~spection ~f completed ~ork, call 588-7704 <br /> (24 hour line) prior to 7. B0 a.M. ito receive the same day <br /> ~ervic8.; <br /> &. Requi~ed i~spections are: ZONING/SETBACKS: Stake property <br /> lines[ FOOTINGS/FOUNDATION: Call ~efore pourine concrete: <br /> UNDEEFLOOE:' Callbefore addinq sublfloor~ FRAN~NG~ ' <br /> E~EC,TRICAL, MECHANICAL~ PL~MBINGt:i~olbe Weather tlgl~t, <br /> chiMney/fireplace installeo~ all blac[ing, fire blockin~ <br /> stairs and soffits in ~lace~ plumbing, electrical~ and <br /> Mechanic:al complete and approved ~or cover, tru~s details <br /> posted., flood elevation certification submitted. <br /> INSULATION: Call before cevered;.~EYWALL: Call before tape <br /> is applied; FINAL INSPECTION: Boliding is complete and <br /> ready to occu . <br /> 7..THIS PLAN EEV~W WAS CONPLETEB BY;N. JONES OM <br /> 8. This is a Plan. Revie~ covering the. re,rooTing of the above <br /> indicated existing building. Pla~e have been revieeed for <br /> compliance ~ith t~e provisions oflthe Oregon Structural Spec <br /> ialty Code (~71UBC) 1~3 Edition.: <br /> ~. All reroofing shall csnforM to the: applicable provisions of <br /> .Chapter ~2 of this cone. <br /> Roofing Materials and Methods of:application shall comply wi <br /> th the. U,B.C. Standards or shall {ollo~ Manufacturer's insta <br /> lla~ion regoireMents ~he~ approved: by the building official. <br /> (OSSC Section 320?) <br />10. New roof coverings shall ~et be aPPlied without first obtain <br /> inq an inspection. A final inepeStio~ and approval shall be <br /> obtained when the reroofing is complete. The preroofing ins <br /> pection shall pay particular attention to evide?e of aCCUMO <br /> lation of water. Where extens:Lvejponding of ~ater is appare <br /> nt~ an analysis of the roof structure for compliance wi~n <br /> Sectie~ ~207 shall be Made and co~:rective Measures~ such as <br /> relocation of roof drains or scuppers~ reslo~inq of the roof <br /> or structural changes~ shall be Ma;de~' : - <br /> An inspection report c?vering ~he above-listed topics prepar <br /> ed by a special inspector Ma~ De accepted in lieu of the pre <br /> inspection bx the building o~ficial. (OSBC Section 3210) <br />11. Built-up roof coverings s~all be completely removed before <br /> Epplying the new roof-covering. New roofing conforming to <br /> Section 3203 shall be applied except that w~en the new'roof <br /> <br /> <br />