My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1290433
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
95-XXXXX
>
Permit - 1290433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 10:00:09 AM
Creation date
9/4/2003 10:04:14 AM
Metadata
Fields
Template:
Permits
Permit Address
600 9TH ST
Permit City
Aumsville
Permit Number
95-00516
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 18, 1995 <br /> <br />CITY OF AUMSVILLE <br /> <br /> 595 Main Street <br />Post Office Box 227 <br />Aumsville, Oregon 97325 <br /> <br /> Phone (503) 749-2030 <br /> Fax (503) 749-1852 <br /> <br />Marion County Bldg. Inspection <br />Attn: Tony <br />285 Church, Rm. 132 <br />Salem, OR 97301 <br /> <br />RE: 600 9TH, AUMSVILLE, NEW CONSTRUCTION, Permit #61100DP <br /> <br />Dear Tony: <br /> <br />It has come to our attention that the foundation for the <br />construction of a single-family home at 600 9th is ._TWO %NC_M~S <br />within the 20' fro~tyard setback requirement; making the distance <br />19 feet and 10" from the property line. Further, the sideyard <br />foundation is three inches into the setback on the north side of <br />the house. <br /> <br />It is the determination of the City of Aumsville to allow the <br />house to remain intact with these errors. However, Mike Kubishta <br />of Keizer Building and Design will request a lot-line adjustment <br />for the sideyard problem. Mr Knbishta has bee~ instructed to <br />"double check" the measurements before foundatzons are formed for <br />all homes constructed from this date forward to assure the City <br />of Aumsville that the foundations are beyond the 20' setback from <br />the property line for the front yard, and 5' for the sideyards, <br />also from the property lines. <br /> <br />Therefore, please approve the inspection for 600 9th Street for a <br />19' and 10" frontyard setback, and a 4' 9" north, sideyard <br />setback. <br /> <br />Please check any future inspections carefully to make sure that <br />measurements have been taken from the property lines before <br />construction of any new foundations. <br /> <br />Thank you for your cooperation. <br /> <br />Have a nice day! <br /> <br />Ramona Hudson, CMC <br />Acting Administrator <br /> <br />c: Keizer Building & Design <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.