My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1290042
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
95-XXXXX
>
Permit - 1290042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 2:15:54 PM
Creation date
9/4/2003 9:54:47 AM
Metadata
Fields
Template:
Permits
Permit Address
11671 EHLEN RD NE
Permit City
Aurora
Permit Number
95-00479
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAGE <br /> <br />FROM: <br /> <br />DATE: <br /> <br />OF <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVFLOPMENT <br />DEPARTMENT <br /> <br />FACSIMILE TRANSMITTAL <br />BUILDING INSPECTION <br /> <br />Tarno Coleman, <br />Plan Check Engineer <br />285 Church St. I~E, Salem, OR 97301-3670 <br />VOICE: (503) 588-5147 <br />F/IX: 373 -4277 ~"~' <br />February 26, 1995 <br /> <br />TO: <br /> <br />Mark Vermeer, P.E. <br />The Ken Bratney Company <br />FD~X (515) 276-2067 <br /> <br />RE: <br /> <br />Del Mesa Farms Project <br />Donald, Oregon <br />Control 95-479 <br /> <br />MESSAGE: <br /> <br />For the most part the foundation plans and structural calculations are very <br />clear. Before completion of the plan review and issuing the building permit <br />we need information on the following: <br /> <br />1) <br /> <br />The soils reporK indicates the storage tank foundations are to be <br />constructed on three feet of compacted crushed rock for the allowable <br />3,000 psf soil bearing pressure used in the design_ This needs to be <br />shown on the plans. <br /> <br />2) <br /> <br />The storage tank shown on Peabody Dwg. 50878 (200 Ton Soy) does not match <br />the height or diameter shown on the foundation drawings and in the <br />foundation calculations. Please submit revised foundation drawings (2) <br />and foundation calculations (1) for this tank. <br /> <br />3) <br /> <br />4) <br /> <br />The drawing submitted by the Scafco Corporation Model 2113SHBT (400 Ton <br />Corn) tanks do not show the field connections required for the assembly of <br />the completed tank and lateral bracing. The drawings do not show the <br />location and gage of the tank shell and stiffeners. Please submit two <br />sets of the complete erection plans. <br /> <br />The drawing submitted by Peabody TecTank does not show all the required <br />field connections regui~ed for assembly of the completed tanks. Note <br />reference 11) to the Peabody TecTank's standard dry erection manual. This <br />was not submitted. Please submit two sets of the complete erection plans. <br /> <br />The calculations submitted by Scafco and Peabody were very clear and appear to <br />be in order. Thank you for your prompt attention to this matter. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.