Laserfiche WebLink
CA~FING FILL $Y$~ CONSTRUCTION DETAIL SHEET <br /> <br />October 19, 1993 <br /> <br />APPLICANT: <br />SITE NUMBER: <br /> <br />FRANKLIN & DELORES WILLIAMS <br />93-3085 <br /> <br /> Your site has been found suitable for a CAPPING FILL ALTERNATIVE SEWAGE <br />DISPOSAL SYSTEM. The following construction specifications shall apply to the <br />installation of your septic system. <br /> <br />The septic tank shall have a minimum liquid capacity of 1000 <br />gallons. <br /> <br />The projected daily sewage flow for this project is calculated at <br />450 Gallons Der day. Based on soil conditions observed on this <br />site, the disposal field will be sized at 150 lineal ..~.9~t per 150 <br />gallons of projected daily sewage flow. A minimum of 450 lineal <br />feet of disposal field will be required for your proposed develop- <br />ment. The disposal trenches are constructed two (2) feet wide and <br />on minimum ten (10) foot centers and with no line exceeding 125 <br />feet in length. The trenches and perforated pipe are installed <br />level (±1") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be constructed with serial distribution <br />with a minimum trench depth of 12 inches and a maximum trench <br />depth of 12 inches. The capping fill material must be inspected <br />and approved prior to placement. The fill shall be of the same <br />textural class, or one class finer, than the native topsoil. The <br />disposal field area must be scarified to destroy any vegetative <br />mat on the surface. Fill material shall be evenly graded to a <br />final depth of sixteen (16) inches over the gravel. CaDDinq Fill <br />systems shal,l,.,,..~e constructed between June 1 and October i or <br />durinq such times when onr sta~, finds soll moisture conditions <br />acceptable. <br /> <br />4. The site must be protested from traffic, livestock, farming or <br /> other damaging activities. <br /> <br /> A groundwater interceptor is required as part of this system. This <br />interceptor trench must be constructed a minimum twelve (12) inches wide by 30 <br />inches deep with 24 inches of clean gravel placed over a four (4) inch smooth <br />wall perforated pip~. The interceptor must be located at least ten (10) feet <br />upslope from the disposal field and must discharge through a watertight, non- <br />perforated pipe beside or below the disposal field. A separation of 25 feet is <br />required from the septic tank if the tank is located upslope of the groundwa- <br />ter interceptor. <br /> <br /> An effluent lift pump may be necessary to construct the disposal field <br />in the approved area and at the correct depth. <br /> <br /> This approval is site specific to the area tested and the septic system <br />must be located in the immediate area of the test pits unless otherwise autho- <br />rized by this office. A new site evaluation may be required if the system is <br />proposed for a different area on the property. <br /> <br />SPECIAL CONDITIONS: <br /> Construct the drainfields within the immediate area of the soil test <br /> pits. There is a moderate to severe rock hazard associated with drain- <br /> field construction. Rock larger than six inches must be removed from <br /> backfill material. Observe all normal setback/separation distances. <br /> <br />THIS IS NOT A PHRMIT TO IN~T,~?.T. THH SEPTIC SYSTEM. DO NOT INSTALL THE SYSTEM <br />UNTIL A VALID PERMIT HAS BEEN ISSUED BY THIS OFFICE. <br /> <br /> <br />