Laserfiche WebLink
October 19, 1994 <br /> <br />APPLICANT: <br />SITE NUMBER: <br /> <br />STANDARD SYSTEM CONSTKUCTION DETAIL SHEET <br /> <br />CHUCK SAKER <br />94-3495, PARCEL A, 5.08 ACRES. <br /> <br /> Your site has been found suitable for a STANDARD ON-SITE SEWAGE DISPOSAL <br />SYSTEM. The following construction specifications shall apply to the installa- <br />tion of your septic system. <br /> <br />The septic tank shall have a minimum liquid capacity of 100Q, <br />gallons. <br /> <br />The projected daily sewage flow for this project is calculated at <br />450 ~allons per daw. Based on soil conditions observed on this <br />site, the disposal field will be sized at 150 lineal fees per 150 <br />~allons of projected daily sewage flow. A minimum of 450 lineal <br />feet of disposal field will be required for your proposed develop- <br />ment. The disposal trenches are constructed two (2) feet wide and <br />on minimum ten (10) foot centers and with no line exceeding 125 <br />feet in length. The trenches and perforated pipe are installed <br />level (Zl") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be constructed with serial distribution <br />with a minimum trench depth of 24 inches and a maximum trench <br />depth of 24......~ches. There must be at least 12 inches of backfill <br />over the top of the gravel, measured from the natural ground <br /> <br /> A groundwater interceptor is required as part of this system. This <br />interceptor trench must be constructed a minimum twelve (12) inches wide by 42 <br />inches deep with 36 inches of clean gravel placed over a four (4) inch smooth <br />wall perforated pipe. The interceptor must be located at least ten (10) feet <br />upslope from the disposal field and must discharge through a watertight, non- <br />perforated pipe beside or below the disposal field. A separation of 25 feet is <br />required from the septic tank if the tank is located upslope of the groundwa- <br />ter interceptor. <br /> <br /> This approval is site specific to the area tested and the septic system <br />must be located in the immediate area of the test pits unless otherwise autho- <br />rized by this office. A new site evaluation may be required if the system is <br />proposed for a different area on the property. <br /> <br />SPECIAL CONDITIONS= <br /> Construct the drainfields as far upslope as possible within the cleared <br /> area of the test pits. Soil conditions are marginal for standard system <br /> construction, use care not to alter the natural topsoil p~ior to drain- <br /> field construction. A preconstruction field stakeout is recommended to <br /> establish the elevations and locations of the individual drainfield <br /> lines. Refer to the stakeout procedure and the setback list for details <br /> to complete the stakeout. <br /> <br />THIS IS NOT A PERMIT TO INSTALL THE SEPTIC SYSTEM. DO NOT INSTALL THE SYSTEM <br />UNTIL A VALID PERMIT HAS BEEN ISS~D BY THIS OFFICE. <br /> <br /> <br />