My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1289736
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
94-XXXXX
>
Permit - 1289736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2015 9:55:24 AM
Creation date
9/4/2003 9:42:17 AM
Metadata
Fields
Template:
Permits
Permit Address
6082 KASA LN SE; 8351 KASA LN SE
Permit City
Aumsville
Permit Number
94-03494
Parcel Number
082W23A 01600
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 19, 1994 <br /> <br />APPLICANT~ <br />SITE NUMBER: <br /> <br />STANDARD SYSTEM CONSTRUCTION DETAIL SHEET <br /> <br />CMUCK BAKER <br />94-3494, PARCSL D, 4.44 ACP~ES <br /> <br /> Your site has been found suitable for a STANDARD ON-SITE SEWAGE DISPOSAL <br />SYSTEM. The following construction specifications shall apply to the installa- <br />tion of your septic system. <br /> <br />The septic tank shall have a minimum liquid capacity of 100_~0 <br />gallons. <br /> <br />The projected daily sewage flow for this project is calculated at <br />450 qallon~. Der day. Based on soil conditions observed on this <br />site, the disposal field will be sized at 150 lineal feet per 150 <br />qallons of projected daily sewage flow. A minimum of 450 lineal <br />~.~et of disposal field will be required for your proposed develop- <br />ment. The disposal trenches are constructed two (2) feet wide and <br />on minimum ten (10) foot centers and with no line exceeding 1~5 <br />feet in length. The trenches and perforated pipe are installed <br />level (Zl") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be Coastructed with serial distribution <br />with a minimum trench depth of 24 inches and a maximum trench <br />depth of 24 inches. There must be at least 12 ~nehes of backfill <br />over the top of the gravel, measured from the natural ground <br /> <br /> An effluent lift pump may be necessary to construct the disposal field <br />in the approved area and at the correct depth. <br /> <br /> A groundwater interceptor is required as part of this system. This <br />interceptor trench must be constructed a minimum twelve (12) inches wide by 42 <br />inches deep with 36 inches of clean gravel placed over a four (4) inch smooth <br />wall perforated pipe. The interceptor must be located at least ten (10) feet <br />upslope from the disposal field and must discharge through a watertight, non- <br />perforated pipe beside or below the disposal field. A separation of 25 feet is <br />required from the septic tank if the tank is located upslope of the groundwa- <br />ter interceptor. <br /> <br /> This approval is site specific to the area tested and the septic system <br />must be located in the immediate area of the test pits unless otherwise autho- <br />rized by this office. A new site evaluation may be required if the system is <br />proposed for a different area on the property. <br /> <br />SPECIAL CONDITIONS: <br /> Construct the drainfields on the convex landforms within the area of the <br /> soil test pits. ~ p~e-construetion field stakeout is required to <br /> establish the elevations and locations of the individual drainfield <br /> lines prior to siting wells and all excavations. Refer to the stakeout <br /> procedure and the setback list for details to complete the stakeout. <br /> Note, especially the fifty feet minimum setback from seasonal drainage <br /> ways. The list of licensed septic system installers and consultants who <br /> can assist with the stakeout are included for your convenience, soil <br /> conditions are marginal for standard system construction. Use care not <br /> to alt~r the natural top,oil prier to constr~ction. Dry soil summer <br /> season construction is recommended to avoid excessive soil compaction. <br /> <br />THIS KS NOT A PERMIT TO INSTALL ~HE SEPTIC SYSTEM. DO NOT INSTALL THE SYSTEM <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.