Laserfiche WebLink
: ianville <br /> <br />Five Ply <br />Mineral. Surfaced <br /> <br />U.L Cta~sifications <br /> <br />Fiber Glass <br />Built./~oof <br /> <br />Specification 5GIC <br />For use over Concrete or Other <br />Non-Nailable Decks and Fesco~ <br />Board, Fes-Core®, Fesco-Foam®, <br />UltraGard Gold®, UltraGard <br />PrernierTM or Approved6!?sulation <br />with Inclines of ti4" to per foot <br />For Regions 1, 2 & 3 <br /> <br />Class A <br />Max- Slepe; 1 <br />Deck: Non-Oombeet, <br />Insulation: Fesco, <br />Fee-Core, Fesco,Foam, <br />UltraGard G01d. UltraGerd <br />Prom)er, none <br /> <br />Max, Slope: 3" <br />Deck: Non-Combust. <br />Insulation; Fesco. <br />Fee-Core. Fesco-Foam. <br />UitraGard Gold, URraGard <br /> <br />OptiOn: f hO Retro. Fit'" overlay Oplion: V¢ Retro-Fit oveday <br />Surfacing; G[asKap.,~ Surfaclng: GlasKap <br /> <br />Deck: Cornbu~. & Non-Combust. } '~ ~ f 15 <br /> <br />UIt~Gard~remier, none / ~ ~ <br />Option: '/~ Retro-Fit oved~yJ ~'~ <br /> <br />General <br />This spedficatlon is [or use over any type of structural deck <br />wh~ is not n~lable and which offers a suitable su~a~ to <br />receive the roof. Poured and pre-cast c~n~ete d~s <br />primi~ wRh M~v~lfe Co,crete Prime~. <br /> <br />It is also for use over Fes~, Fee-Core, Fesco-F~am, Ultra- <br />Gard Gold, UltraGerd Premier or other approved insulations <br />which are not nailable and which offer · suitable suflece to <br />receive the mol Insulations should be ins~lled in a~ordance <br />with Manville ~nsalatlon Specift~tions 5~, 501,502, o~ ~03. <br />Refer to the Manville {ndu~tr[al/Commemi~l Roofing Systems <br />M~UaL It c~n Al~ be used over Manville R~cover Sp~f~A* <br />fions RC-1, RC-2, RC-3 or RC-4, This specifi~fion is not to be <br />aped directly over ~ypsum, lightweight insulating <br />decks, either Doured or pre*cast, o~ ever fill made of <br />weight Insulat~ng ~ncrete. <br /> <br />Design and installation of the deck and/or roof substrata <br />mast result in the roof draining freely to oft/tots numerous <br />enough and so located as to remove water promFtly end <br />completely. Areas where water ponds for more than P4 <br />hours are unacceptable and will not be guaranteed- <br /> <br />Note: All general instructior~$ contained in Ihe current Manville <br />Industrial/Commercial Roofing Systems Manual should be <br />considered pad of this speclflcation. <br /> <br />Flashings <br />Flashing details are available on separate specification sheets <br />or can be found in the Built-Up Roofing Systems P¢oduetS a~d <br />Specifications Manual or the Manville Industrial/Commercial <br />Roofing Systems Manual. <br /> <br />7O <br /> <br />Materials per 100 eq, fl, of Roof Area <br /> <br />Concrete Primer: <br />If required ............. <br /> <br />Felts: <br />GJasPly~ Premier or GlasPly JV ....... ,, ........................... 4 plies <br />GlasKap Mineral Surfaced Cap Sheet ............................ 1 <br /> <br />l~ltumen; <br />Incline per toOt Aapha}t Nomirlal Weight <br /> Up to 1" 170'F, Type Il, Flat 92 lbs. <br /> 1" to 3" 190'F, Type tit, Steep 92 lbs. <br /> 3" m 6" ~20~F, Type IV, ~pecJa. I Steep 9;~ lbs. <br /> <br />Approximate installed weight: 200 - 254 lbs. <br /> <br />Application <br />Note: On roof decks with slopes up to 1" per toot the roofing <br />felts in mineral surfaced specifications may be installed either <br />pergendicular or perafie~ to the mo[ <br /> <br />Using GlasPJy Pre. Jar or GfasPly IV, start with <br />wide, then ever that. one 18" wide, than over theL one 27" <br />wide, then over 8]] three, a tull width piece, The following faits <br />Are to be applied tull width, Overlapping the pre.ding felts <br />27 V~" ¢ thA~ at least 4 plies of felt cover the substrata <br />locations. Install e~ch felt so tha~ tt is firmly and uniformly <br />without voids, into the hot asphalt (within 25~¢ of the EVT) <br />applied j~s[ before the felt al a nominal rate of 23 lbs, per <br />square over the andre surface, When installed over insuta. <br /> <br />may be need~ due to the absor~ncy ef ~he <br /> <br /> <br />