Laserfiche WebLink
April 27, 1994 <br /> <br />APPLICANT: <br />SITE NUMBER: <br /> <br />STANDARD SYSTEM CONSTRUCTION DETAIL SHEET <br /> <br />LARRY KEUDELL <br />94-1622, PARTITION, 3 OF 6 AcRES~ S. PO T/L 200 <br /> <br /> Your site has been found suitable for a STANDARD ON-SITE SEWAGE DISPOSAL <br />SYSTEM. The following construction specifications shall apply to the installa- <br />tion of your septic system. <br /> <br />1. The septic tank shall have a minimum liquid capacity of 1000 <br /> gallons. <br /> <br />2. The projected daily sewage flow for this project is calculated at <br /> 450 qallons per day. Based on soil conditions observed on this <br /> site, the disposal field will be sized at 150 lineal feet per 150 <br /> qallons of projected daily sewage flow. A minimum of 450 lineal <br /> feet of dispesal field will be required for your proposed develop- <br /> ment. The disposal trenches are constructed two (2) feet wide and <br /> on minimum ten (10) foot centers and with no line exceeding 125 <br /> feet in length. The trenches and perforated pipe are installed <br /> level (~i") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be constructed with serial distribution <br />with a minimum trench depth of 24 inches and a maximum trench <br />depth of 24 inches. There must be at least 12 inches of backfill <br />over the top of the gravel, measured from the natural ground <br /> <br /> An effluent lift pump may be necessary to construct the disposal field <br />in the approved area and at the correct depth. <br /> <br /> This approval is site specific to the area tested and the septic system <br />must be located in the immediate area of the test pits unless otherwise autho- <br />rized by this office. A new site evaluation may be required if the system is <br />proposed for a different area on the property. <br /> <br />SPECIAL CONDITIONS: <br /> Construct the drainfields within the immediate area of the soil test <br /> pits. Soil conditions are marginal, so use care not to alter the natural <br /> topsoil prior to drainfield installation. A pre-construction field <br /> stakeout of the individual drainfield lines for both systems is recom- <br /> mended prior to siting any wells. Refer to the stakeout procedure and <br /> the setback list for details to complete the stakeout. Allow space for a <br /> future upslope curtain drain should it prove necessary. Note, especially <br /> the required separation between the septic tank and curtain drain <br /> depending upon whether the tank is above or below the curtain drain. <br /> <br />THIS IS NOT A PEP. MIT TO INSTALL TW~- SEPTIC SYSTEM. DO NOT INSTALL THE SYSTEM <br />UNTIL A VALID ~,IT HAS BEEN ISSUED BY THIS OFFICE. <br /> <br /> <br />