My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AR25-009 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2025
>
Administrative Review
>
AR25-009 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:55:44 AM
Creation date
6/6/2025 7:55:57 AM
Metadata
Fields
Template:
Land Use
Case_Number
25-009
Document_Date
6/6/2025
Land Use Type
Administrative Review
Tax_Lot_Number
082W03C004200
Document_Type
Decision
Site_Address
6800 BLOCK OF HERITAGE HILL RD SE SALEM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision <br />to a Marion County hearings officer. The applicant may also request reconsideration (one time only and a $200.00 fee) on <br />the basis of new information subject to signing an extension of the 150-day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form <br />available from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, <br />Salem by 5:00 p.m. on June 23rd, 2025. If you have questions about this decision, contact the Planning Division at (503) <br />588-5038 or at the office. This decision is effective June 24th, 2025, unless appealed. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />1. The subject property is designated Special Agriculture in the Marion County Comprehensive Plan and zoned SA <br />(Special Agriculture). The purpose of this zoning is to provide areas for commercial agriculture operations of <br />various sizes in order to obtain maximum resource production from these lands. <br /> <br />2. The subject property is located north of Heritage Hill Rd SE and is situated approximately 1,800 feet west of the <br />intersection with 71st Ave SE. The property consists of one small farm building near the road, and the rest is <br />covered in landscaping trees used for the farming operation. The property gently slopes downhill from the south <br />to the north. <br /> <br /> The subject property was created as Lot #7 of the Churchill Walnut Grove Subdivision #2 in 1916. A Legal Lot <br />Determination for this subdivision was done to determine the legal lots on the property. This determination found <br />that Lot 7 is a legally recognized lot because the divisions took place prior to the county’s adoption of land use <br />planning regulations. Therefore, this parcel is legal for land use purposes. <br /> <br />3. Surrounding uses in the area include a mix of commercial farming operations of various sizes and a number of <br />nearby acreage homesites to the north and southwest. The property is also located within a mile of the City of <br />Salem urban growth boundary. <br /> <br />4. The applicant is proposing to establish a primary farm dwelling on the property based on an income standard. The <br />dwelling will be lived in by an individual principally engaged in day-to-day farm operations. <br /> <br />5. Soil Survey of Marion County Oregon shows that 100% of the soils on the property are high value. <br /> <br />6. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> Requirements: <br /> <br />A. An Access Permit will be required at the time of application for building permits. <br />B. Transportation System Development Charges (SDCs) and Parks fee will be assessed at the time of <br />application for building permits. <br />C. Utility service extensions originating from the public right-of-way require permits from PW Engineering. <br /> <br /> Advisories: <br /> <br />D. Heritage Hill Road is a Local Access Road not maintained by Marion County. Maintenance defaults to <br />adjacent property owners. <br /> <br /> Marion County Building commented: “No Building Inspection concerns. Permit(s) are required to be obtained prior <br />to the development of structures and/or utilities installation on private property.”
The URL can be used to link to this page
Your browser does not support the video tag.