Laserfiche WebLink
FRAME TiE INSTALLATION INSTRUCTIONS <br /> <br />Frame Tie With Hook <br /> <br />1,) Attach frame hook Io top, <br /> inboard location of I-beam, <br /> (Frame hook must be attached <br /> to frame al points,closest to <br /> floor supports.) <br /> <br />2.) Keeping in line with the hook, <br /> wrap galvanized strap com- <br /> pletely around i-beam. <br /> <br />Frame Tie With Buckle <br /> <br />*Anchor must be securely <br />installed into the ground before <br />proceeding with step//3. <br /> <br />Thread loose end ol strap <br />through slotted tensioning bolt <br />attached to tensioning head of <br />anchor. Tighten slotted len- <br />sloning bolt a minimum of 5 <br />times & until all stack in strap <br />is removed, <br /> <br />1.) Thread 7' length (~f lrame tie <br /> strap through strap buckle ss <br /> shown. <br /> <br />2.) Next, thread long end of strap <br /> between frame and floor of <br /> home, Bring strap through <br /> buckle as shown in diagram <br /> and fasten to anchor head, <br /> <br />3) Diagram shows strap in posi- <br /> tion around frame and through <br /> buckle. Il is important to remove <br /> all slack from system, <br /> <br />15 <br /> <br /> <br />