My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1283449
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
93-XXXXX
>
Permit - 1283449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2010 2:17:30 PM
Creation date
9/3/2003 3:54:29 PM
Metadata
Fields
Template:
Permits
Permit Address
100 DETROIT AV
Permit City
Detroit
Permit Number
93-03272
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Darlene Mann <br />P.O. Box 367 <br />Idanha, OR 97350 <br /> <br />July 13, <br /> <br /> D~ARTMENT OF <br /> ,t t, ? 5 199,' <br /> ENVIRONMENTAL <br /> <br />BUILDING INSP£C:I-t0 <br /> <br />Re: <br /> <br />OSSD-Problem Area <br />Korner Post Eatery <br />Response to Aqua Test <br />Letter dated June 28, <br />1993; Lots 25 & 26 <br />Block 6 Hammond <br />Addition, Detroit <br />Marion County <br /> <br />Willamette VaLley Regior~ <br /> <br />Dear Ms. Mann: <br /> <br />We have received and reviewed a copy of the letter from <br />Dan Bush dated June 28, 1993. We have no problems with <br />the concept presented in that letter which, in general <br />terms, describes a short term solution to resolve the <br />potential for public health hazard caused by the <br />malfunctioning sewage disposal system at your restaurant <br />and describes a long term solution to be installed in the <br />near future. <br /> <br />One of the aspects of the short term solution, the use of <br />chambers, or the Infiltrator, does present a minor <br />procedural problem. The use of these devices is not <br />included in the scope of technology in Oregon <br />Administrative Rules (OAR) Chapter 340-71, which is <br />administered by contract by the Marion County Building <br />Department. Therefore, in order to utilize this <br />technology, it is necessary to apply for a Water Pollution <br />Control Facility (WPCF) Permit to be issued by the <br />Department of Environmental Quality. <br /> <br />~n order to begin this procedure, you must request an <br />application from Darlene Hoge in the Municipal Wastewater <br />Section of our Portland office (229-5437). At that time, <br />she can inform you concerning permit fees and <br />documentation that must be submitted with your <br />application. <br /> <br />Please call me by July 20, 1993, to indicate how you <br />intend to proceed. If you choose to follow the <br />suggestions of Dan Bush, please make application for a <br />WPCF permit by no later than July 31, 1993. <br /> <br />Barbara Roberts <br /> <br />750 Front St, NE <br />Suite 120 <br />Salem, OR 9731(1 <br />(503) 378-8240 <br />DEQ/WYR-101 1,91 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.