Laserfiche WebLink
A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Requests for reconsideration, or consider- <br />ation by a hearings officer, must be in writing (form available from the Planning Division) and received in the Marion <br />County Planning Division, 5155 Silverton Rd. NE, Salem, by 5:00 p.m. on June 11th, 2025. If you have questions about <br />this decision, contact the Planning Division at (503) 588-5038 or at the office. This decision is effective June 12th, 2025, <br />unless further consideration is requested. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />l. The subject property is designated as Rural Residential in the Marion County Comprehensive Plan. The major <br />purpose of this designation and the corresponding Single Family Residential (RS) zone is to allow development of <br />attached or detached residences on individual lots in areas outside the acknowledged urban growth boundaries but <br />under County planning jurisdiction. <br /> <br />2. The subject parcel is described as Lot 8, of Block 6, of Labish Village subdivision plat (recorded in the Book of <br />Town Plates Volume 15, Page 37) and is shown on a survey from 1948 (survey S15-037). The subject property has <br />retained the same description since at least 1970 as indicated in deed Volume 688, Page 612. The parcel has a <br />dwelling that the Marion County Tax Accessor dates to 1951; therefore, the parcel and the dwelling are legal for <br />land use purposes. <br /> <br />3. The property is located in the unincorporated community of Labish Village. Labish Village is roughly a mile north <br />of the City of Salem Urban Growth Boundary (UGB) and a mile east of I-5. The subject parcel is 0.17-Acres (7,405 <br />square feet) in a developed neighborhood of similar lot sizes. <br /> <br /> The subject parcel contains a primary dwelling that has received several building permits to improve the dwelling. <br />In November 2023 the property owners applied for building permits to add a two-car garage with three bedrooms, <br />a kitchen, and additional living space over the new garage. The Marion County Planning Department approved the <br />addition without any conditions. It is unclear if the owner completed this work. Then in April of 2024, the owner <br />submitted revised building permits for a residential revision to add a 6-foot by 22-foot addition to the project. <br />Marion County Planning Department approved the building permit and indicated the required property line <br />setbacks. At that time there were no indications that this was to be a duplex, and the site plan submitted was labeled <br />“proposed addition;” this revision to the building permit was signed off by the Planning Department in August <br />2024. <br /> <br /> During the Marion County Building Inspection’s duties, they determined that the applicant had in fact created a <br />duplex. This triggered a building plans review by the Marion County Planning Department where the Planning <br />Director determined that a duplex on a corner lot in the rural single-family zone could be accomplished through the <br />approval of a conditional use permit. <br /> <br />4. All adjacent parcels are zoned rural RS. Outside of the Labish Village community are EFU zoned parcels in <br />agricultural use. <br /> <br />5. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br /> Marion County Land Development, Engineering and Permits (LDEP) commented: <br /> <br /> ENGINEERING REQUIREMENTS <br /> <br />A. Under a new Access Permit, add 3 inches x 16 feet wide of ¾-minus compacted crushed rock to the public <br />side road serving the proposed duplex. The permit fee paid on prior permit #23-001424-PW, since closed <br />out, will be credited forward toward that. <br />B. Transportation System Development Charges (SDCs) and Parks fee will be assessed at the time of <br />application for building permits. Credit will given for fees already paid toward the ADU. <br />C. Utility service extensions within the public Right-of-Way require permitting through PW Engineering. <br /> <br />