My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FP25-003 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2025
>
Floodplain/Greenway
>
FP25-003 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 7:33:13 AM
Creation date
5/27/2025 7:33:30 AM
Metadata
Fields
Template:
Land Use
Case_Number
25-003
Document_Date
5/27/2025
Land Use Type
FloodPlain
Tax_Lot_Number
082W33BA00100
Document_Type
Decision
Site_Address
8005 MARION RD SE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />l. The subject property is designated Special Agriculture in the Marion County Comprehensive Plan and <br />correspondingly zoned SA (Special Agriculture). It is also located within the identified 100-year floodplain of the <br />Mill Creek. <br /> <br />2. The subject property is located directly west of Marion Rd SE in Turner. It is located directly southwest of <br />Marion Road’s intersection with Mill Creek SE Mill Creek Rd SE. The property is almost entirely within the 100- <br />year floodplain of the Mill Creek. The most southwestern portion of the property is within the regulatory <br />floodway. As per aerial images and PLA22-020, the property previously had a dwelling and other accessory <br />buildings on it. <br /> <br />The property was the subject of land use case AR94-073 and PLA22-020. AR94-073 was done to determine the <br />legality of a nonconforming use on the property, and PLA22-020 was done to adjust the property lines between <br />the subject parcel and the two neighboring parcels to the northwest. Therefore, the subject property is considered <br />legal for land use purposes. <br /> <br />3. Surrounding lands are zoned SA with most being almost entirely within the 100-year floodplain of Mill Creek. <br />Most surrounding properties contain homesites. The surrounding properties approximately 600 feet west lie <br />within the Turner Urban Growth Boundary. <br /> <br />4. Soil # % of Parcel SCS Soil Class High Value? <br /> Clackamas gravelly loam 95.2% 3 Yes <br /> <br /> Courtney gravelly silty clay 4.6% 4 Yes <br /> loam, 0 to 3% slopes <br /> <br /> Sifton gravelly loam 0.2% 3 Yes <br /> <br />5. The applicant(s) propose to place a dwelling within the 100-year floodplain of the Mill Creek. The home will be <br />elevated at a minimum of 2 feet above the BFE. An elevation certificate and Endangered Species Act Compliance <br />Data were provided with the application. Additional elevation certificates will be required. <br /> <br />6. Various government agencies were contacted with opportunities to provide comment. <br /> <br />Marion County Building Inspection commented: “Permit(s) are required to be obtained prior to the development <br />of structure(s) and or utilities installation on private property. If any structure is within any floodplain or <br />floodway as determined by the Marion County Floodplain Administrator, then the floodplain construction <br />provisions of 2023 ORSC Section R322 would be applicable and would be required to be shown upon the <br />construction drawings to be checked during plan review after permit application is made.” <br /> <br /> Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> Requirements: <br /> <br />A. At the time of application for building permits, an Access Permit will be required to document inspection <br />of the existing paved access. <br /> <br />B. Transportation System Development Charges (TSDCs) and Parks fee will be assessed at the time of <br />application for building permits. <br /> <br />C. New underground utility service extensions such as electric power originating from within the public right- <br />of-way to the property require a permit from MCPW Engineering. <br /> <br />All other contacted agencies failed to comment or stated no objection to proposal.
The URL can be used to link to this page
Your browser does not support the video tag.