Laserfiche WebLink
Title reports shall be no more than 15 days old at the time of approval of the plat by the Surveyor’s Office, which <br />may require additional updated reports. <br />Property Line Adjustment: <br />- A re-plat (in the form of a partition plat) is required, due to the adjustment or elimination of a partition plat <br />parcel line or subdivision lot line. <br /> <br />Re-plat: (Re-configuration of lots or parcels and public easements within a recorded plat) <br /> - Must be surveyed and platted per ORS 92.050, and the plat submitted for review. <br /> - Checking fee and recording fees required. <br /> - A current or updated title report must be submitted at the time of review.” <br /> <br />Marion County Building commented: “No Building Inspection concerns with proposed partition(s). It is <br />recommended any new or adjusted property lines be established at least 3 feet from existing residential structures <br />or 10 feet from existing commercial structures (if applicable). Permit(s) are required to be obtained prior to <br />development of structures and/or utilities installation on private property if proposed.” <br /> <br />Marion County Septic commented: “Parcel 1 had an existing system evaluation in 2024 under permit 555-24- <br />006535. Parcels 2 and 3 obtained approved site evaluations under permits 555-24-006537 and 555-24-006538. A <br />construction-installation permit is required prior to system installation of parcels 2 NS 3. All items required for <br />septic partition approval have been met.” <br /> <br />Marion County Land Development, Engineering and Permits (LDEP) requested the following be included: <br /> <br />ENGINEERING REQUIREMENTS <br /> <br />A. Depict and/or reference appropriate access and utility easements on the partition plat. <br /> <br />B. Per the 1981 County Resolution “In the Matter of Restricted Access on Cordon Road”, BOC administrative <br />concurrence (or non-opposition) is necessary prior to issuance of building permits in order to authorize an <br />intensification of usage to the existing Cordon Road access point via private easement Cordon Lane as an <br />alternative to a potential Fitzpatrick Creek bridge crossing. No additional access point to Cordon Road will <br />be granted. <br /> <br />Marion County Tax Assessor provided tax related information. <br /> <br />All other contacted agencies either failed to comment or stated no objection to proposal. <br /> <br />6. There are no specific approval criteria for partitions in the AR zone. MCC 17.128.070 requires a minimum lot <br />size of two acres and the new parcels are consistent with this standard. Subsequently, the proposal meets the <br />criteria for partitioning in the AR zone. <br /> <br />7. Based on the above findings, the proposed partition complies with the applicable criteria and is, therefore, <br />APPROVED. <br /> <br /> <br />Brandon Reich Date: May 5th, 2025 <br />Planning Director/Zoning Administrator <br /> <br />If you have any questions regarding this decision contact John Speckman at (503) 588-5038 <br /> <br />Notice to Mortgagee, Lienholder, Vendor or Seller: ORS Chapter 215 requires that if you receive this Notice, it must <br />promptly be forwarded to the purchaser.