My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1277748
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
92-XXXXX
>
Permit - 1277748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2011 8:24:41 AM
Creation date
9/3/2003 1:02:21 PM
Metadata
Fields
Template:
Permits
Permit Address
45555 BREITENBUSH RD SE
Permit City
Detroit
Permit Number
92-01434
Parcel Number
095E 00100
Permit Type
Permit
Extra Information
MP 0.9
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Upper Arm Day Use Area <br /> <br />Septic System Design Criteria <br />and <br /> Operation Guide <br /> <br />Baokqround Infgrmation: <br /> <br /> In order to have flush toilets at the Upper Arm Day Use Area, we are <br />required to have an adequate septic system and replacement system which wi~ <br />handle the wastewater. We (the Federal Government) must follow the regulations <br />set by the State and County. Because of our unusua~ wastewater situations, no <br />accurate load design data is available. Therefore, the system design incorporates <br />monitoring of the water usage and drain field performance which not only insures <br />the system is working but also provides us data for future designs. <br /> <br />SYstem: <br /> The system consists of <br /> - Restroom Building with 4 toilets, 2 sinks, & I urinal <br /> - 1500 gal. septic tank <br /> - 1000 gal. septic tank (for Host Site) <br /> - 2 inspection pipes for monitoring <br /> -approx. 400' of drain line. <br /> <br />The replacement system consists of the above system p[us - 1000 gal, dosing tank (with pump) <br /> - 24' x 24' sand filter <br /> <br />Operation: <br /> 1. Determine the peak flows from water meter monitoring. <br /> <br />One day per weekend and on all Holidays wastewater levels in <br />the inspection pipes shall be measured and recorded at peak <br />flows. <br /> <br />A copy of the Data Reports should be sent to the Facility <br />Engineering Department at the Supervisors Office and Marion <br />County if requested, <br /> <br />-. <br /> <br />If standing water in the inspection pipe is maintained at a <br />significant level for 24 hours, immediately contact the District <br />Recreation Assistant for closure procedures. <br /> <br />5. The replacement system shall be constructed in accordance <br /> with the County Sanitarians recommendations. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.