Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DI=PARTMENT <br /> <br />BUll DING INSPECTION <br />~503) 5885038 <br /> <br />OFFICER <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />OWNER: <br /> <br />SITE NUMBER: <br /> <br />TYPE OF CONSTRUCTION: <br /> <br />BUILDING CLASS: <br /> <br /> MTRUCTUP=%L PLaiNS REVIEW <br /> June 24, 1991 <br /> <br /> 985 Olney St, Aumsville <br /> J.M. Wadsworth <br /> 10345 <br /> 5-N <br /> <br /> B-2 (Storage) <br /> (2 @ 4,000 sq. ft.) (Phase 2 & 3) <br /> <br />The plans for the above indicated project are acceptable as submitted <br />subject to the following items noted below: <br /> <br />This is a Plan Review coverisg the sosstructton Of the above indicated new <br />buildings. Plans have been reviewed for compliance with the provisions of the <br />Oregon State Structural Specialty Code (UBS) 1990 Edition. <br /> <br />This building has been reviewed as a Group B Division 2 occupancy. If <br />the proposed use of any section of the building constitutes a higher <br />fire hazard, the proposed use will have to meet building code <br />requirements including but not limited to fire resistive occupancy <br />separations. <br /> <br />The design of the roof trusses was not submitted with the plans and is <br />not included in this plan review. Roof trusses are required to be <br />designed by an Oregon registered engineer or architect. When the truss <br />supplier is selected, submit the structural drawings and design <br />calculations for review. <br /> <br />3. Note the special detail for one-hour fire walls on the revised plans. <br /> <br />Approval Of submitted plans is not an approval of omissions or oversights by <br />this office or of noncompliance with any applicable regulations of local <br />government. <br /> <br />Senator Building · 2201'hgh Street NE Salem, Oregon 9730]-3670 <br /> <br /> <br />