<br /> ENGINEERING CONDITIONS <br /> <br />Condition A: On the partition plat dedicate a 50-foot R/W half-width over the Golf Club Road subject <br />property frontage to meet the City of Stayton Minor Arterial standard [MCC16.27.210(E)(7) & <br />16.33.260]. <br /> <br />Condition B: Prior to partition plat approval, record a non-remonstrance agreement as to non-objection <br />and financial responsibility attached to the larger rear shadow parcel for deferred future Golf Club Road <br />frontage improvements meeting City of Stayton Minor Arterial design standards to include the two <br />proposed smaller frontage parcels at the time the rear shadow parcel is annexed and developed into a city <br />subdivision so that sufficient traffic safety and pedestrian connectivity measures such as road widening, <br />turn lane, re-graded shoulder or curb/gutter/sidewalk and access closure/consolidation as determined by <br />the appropriate agencies at that time may be implemented [MCC 16.33.320]. <br /> <br />Condition C: Prior to plat approval permanently close the parent parcel south access loop approach <br />connection by removing the drainage culvert, restoring the ditch cross-section and removing the paved <br />apron approach [MCRTSP Policy 10.3.5 (10a)]. The portion of internal gravel driveway on private <br />property beyond the required 50-foot R/W half-width expansion may remain. <br /> <br />ENGINEERING REQUIREMENTS <br /> <br />D. The proposed smaller (0.73-acre) developable parcel will not be granted direct access to Golf <br />Club Road; access for that parcel shall be derived internally via access easement and/or future <br />city R/W. <br />E. Transportation System Development & Parks charges will be assessed upon application for <br />building permits for a new dwelling. <br />F. Utility extension work in the public right-of-way requires permits from PW Engineering. <br /> <br />Marion County Surveyors Office commented: <br /> <br />1. Parcels must be surveyed and monumented. <br />2. Per ORS 92.050, plat must be submitted for review. <br />3. Checking fee and recording fees required. <br />4. A title report must be submitted at the time of review. Title reports shall be no more than 15 days old at <br />the time of approval of the plat by the Surveyor’s Office, which may require additional updated reports. <br /> <br />Marion County Onsite Septic commented: <br />“0.73-acre parcel will require soils and site evaluation, 4.29-acre parcel has septic history and appears to have <br />room for a repair, the 15.36-acre parcel will need a soils and site evaluation before building.” <br /> <br />Marion County Building commented: <br />“No Building Inspection concerns with proposed partition. It is recommended new property lines be established <br />at least 3 feet from any existing residential structures. Permit(s) are required to be obtained prior to any <br />development of structures and/or utilities installation on private property, if proposed.” <br /> <br />All other contacted agencies: Either failed to comment or stated no objection to the proposal. <br /> <br />6. In order to partition land in UT zone the standards and criteria in Chapter 16.13.310 of the Marion County Code <br />(MCC) must be met: <br /> <br /> A. A series partition, subdivision, residential planned development or other residential development of a lot, as <br />the lot existed upon application of the UT zone, that results in the division of land into four or more lots intended <br />to be occupied by dwellings or mobile homes, is not permitted in the UT zone. <br /> <br /> The applicant proposes to divide one 20-acre parcel into three parcels of 4.29-acres and 0.79-acres and 15.36- <br />acres each. The partition will result in three parcels. Based on these facts, this criterion does not apply. <br />