Laserfiche WebLink
Date: <br /> <br />By: <br /> <br />MARION COUNTY <br />BUILDING INSPECTION <br />ELEC?I~!~AL PERMIT <br /> <br />220 High Street NS <br />Salem, Oregon 9730¶ <br />Ph: S88-S147 <br /> <br />BLDG, PERMIT #; <br /> <br />ELEC, PERMIT #: <br /> <br /> ATE: <br /> <br />NO. RESIDENTIAL <br />~ Residence wiring less than 1000 sq, ft ................................. ~ $ 30,00 <br />~ Residence wiring ~ess then 2000 sq. ft ................................. ~ $ 50.00 <br />~ Residence wiring over 2000 sq. ft ...................................... ~ $ 70,00 <br />,.~ Electric heat Installation jn existing residence ......................... ~ $ 20.00 <br /> SERVICES ~ ~ <br />~ Service chanoe only In an oxi,tmo r,si~enco ....................... ;,,~ 20,00 <br />~ Servlee not ovor ~00 amperes ......................................... ~ $ 80, <br />Servloo ovor ~00 am~oroo ~ut not mot, than 200 amporos .............. ~ $ <br />__ Service over 200 amperes but not more than 400 amperes .......... ~ $ ~0 COUNTY <br />~ Service over 400 ampere~ but not more than 600 amperes .............. ~ ~'~( <br />__ Service over 600 amperes ............................................ ~ $ 130.00 <br />__ Service over 600 volts ................................................ ~ $ 300.00 <br /> COMMERCIAL AND INDUSTRIAL FEEDERS <br />Installation of Alterations or Relocation of Distribution Feeder= <br />__ Not more than 100 amperes .......................................... ~ $ 20,00 <br />¢ Over 100 amperes but not more than 200 amperes ..................... ~ $ 30.00 <br />..... Over 200 amperes but not ~ore than 400 amperes ..................... ~ $ 50.00 <br />~ Over 400 amperes .................................................... ~ $ 60.00 <br />~ Feeder over 600 volts ............................... .................. ~ $ 80.00 <br /> MISCELLANEOUS <br />__ A, Each trailer or mobile home space {Service equipment) ................... ~ $ 20,00 <br />__ B, Each supply for mobile home (connection) ............................ ~ $ 20,00 <br />~,_ C. Each irrigation pump (Atte~ a map showing location) ..................... ~ $ 20.00 <br />__ O, Each electric sign or outline ~ighting ............................... ~ $ 20,00 <br />__ E, Each residential swimming pool .................................... ~ $ 20.00 <br /> BRANCH CIRCUITS <br />__ One new circuit; alteration or extension ............................... ~ $ ~5,00 <br />_~ Two or more new curcuits; alterations or extensions ................... ~ $ 20.00 <br />__ Other (as per NEC and Building Official) ........................................... <br /> <br /> PLAN REVIEW FEE <br />Please return COMPLETE APPLICATION <br />with the indicated fee. iNVESTIGATION FEE <br /> FLEET SURCHARGE .... <br /> TOTAL .$ <br />I agree to make the electrical installation according to the submitted plans and specifications, the laws of the State of Oregon and <br />the Ordinances of Marion County. PERMIT EXPIRES IF~ORK NOT~OMMENCED WITHIN 180 DAYS. <br /> <br />~ HOMEOWNERS - ~ hereby certify that I~m the owner of the property described above, at which location I propose to make an <br /> electrical installation for my own uae and thi~ property is ~t bein~ constructed for sale, lease or rent. <br />SIGNATURE OF APPLICANT: <br /> <br /> <br />