Laserfiche WebLink
OTHER PERMITS, FEES, AND RESTRICTIONS: This approval does not remove or affect covenants or restrictions <br />imposed on the subject property by deed or other instrument. The proposed use may require permits and/or fees from <br />other local, State or Federal agencies. This decision does not take the place of, or relieve the responsibility for, obtaining <br />other permits or satisfying any restrictions or conditions thereon. It is recommended that the agencies mentioned in the <br />findings below be contacted to identify restrictions or necessary permits. The applicant is advised of the following: <br /> <br />7. The applicants should contact the Jefferson Fire District to obtain a copy of the District’s Recommended Building <br />Access and Premise Identification regulations and the Marion County Fire Code Applications Guide. Fire District <br />access standards may be more restrictive than County standards. <br /> <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Director must condition or deny the application. Anyone who disagrees with the Director's decision may request <br />that the application be considered by a Marion County hearings officer after a public hearing. The applicant may also <br />request reconsideration (one time only and a fee of $200) on the basis of new information subject to signing an extension <br />of the 150-day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Requests for reconsideration, or <br />consideration by a hearings officer, must be in writing (form available from the Planning Division) and received in the <br />Marion County Planning Division, 5155 Silverton Rd. NE, Salem, by 5:00 p.m. on December19th, 2024. If you have <br />questions about this decision, contact the Planning Division at (503) 588-5038 or at the office. This decision is effective <br />December 20th, 2024, unless further consideration is requested. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />l. The subject property is designated Primary Agriculture in the Marion County Comprehensive Plan and zoned <br />EFU (Exclusive Farm Use). A temporary manufactured home/RV under hardship conditions may be approved as <br />a conditional use provided the need is justified and the residence will not have a detrimental impact upon the <br />existing or potential farming and timber activity in the area. <br /> <br />2. The property is located on the southern side of Jefferson Marion Rd SE, approximately 1400 feet south of its <br />intersection with Parrish Gap Rd SE. The property contains a dwelling built in 1901 and 3 accessory structures. <br />The property is considered legal for land use as the dwelling was legally established prior to zoning ordinances in <br />Marion County. <br /> <br />3. Surrounding uses are a mix of farm and forest in all directions, with some residential uses to the northwest. The <br />main standout feature is the railroad right-of-way bordering the parcel to the south. <br /> <br />4. A signed Primary Care Provider Certificate has been submitted for Thomas Wilson indicating they have medical <br />conditions that preclude them from maintaining a complete separate and detached dwelling apart from their <br />family. <br /> <br />5. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br />Marion County Building Department commented: “No Building Inspection concerns with RV as a hardship <br />dwelling. Permit(s) would be required to be obtained prior to utilities installation, if proposed to be installed.” <br /> <br /> Marion County Septic Department commented “Marion County does not have history of the existing septic <br />system. An authorization is required to connect the medical hardship to the existing system. Hardship <br />authorizations are valid for up to 5 years, not exceeding the cessation of the hardship per OAR 340-071-0205(7).” <br /> <br />All other commenting agencies stated no objection to the proposal or failed to provide comments. <br /> <br />6. In order to approve a manufactured home/RV under medical hardship the applicant must demonstrate compliance <br />with the specific criteria listed in MCC 17.120.040. Those that apply to this case include: <br />