My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FP24-006 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
Old Cases
>
2024
>
FP24-006 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 11:05:45 AM
Creation date
11/15/2024 11:06:05 AM
Metadata
Fields
Template:
Land Use
Case_Number
24-006
Document_Date
11/15/2024
Land Use Type
FloodPlain
Tax_Lot_Number
082W18B000200
Document_Type
Decision
Site_Address
3840 BOONE RD SE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
decision contact the Planning Division at (503) 588-5038 or at the office. This decision is effective December 3rd, 2024 <br />unless further consideration is requested. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />l. The property is designated Industrial in the Salem Area Comprehensive Plan. It is currently zoned IC (Industrial <br />Commercial) by Marion County. The purpose of this zone is to provide areas suitable for light industrial uses such <br />as warehousing, wholesale commercial sales and services with related outdoor storage or retail sales. <br /> <br />2. The property is located on the south side of Boone Rd SE, at the western terminus of the section that intersects <br />with Turner Rd SE. The railroad on the western border of the subject parcel separates this section of Boone Rd SE <br />from the rest of the road that stretches west from Eastland to 22nd Ave SE. The subject parcel is within the City of <br />Salem Urban Growth Boundary (UGB) and the Santiam Water Control District. The subject parcel contains a <br />11,250 square foot warehouse built in 1978, and approximately 4-acres of outdoor storage area for vehicles and <br />materials. The subject parcel is entirely within the 100-year floodplain of Mill Creek, with the exception of an <br />approximately 15-foot band of 500-year floodplain against the railroad right of way on the western property line. <br /> <br />The parcel comprises a portion of the northwestern corner of lot 1 of the Hanshaw Fruit Farms Plat. The parcel <br />was described in its current configuration by deed on January 5, 1977 and is therefore legal for land use purposes. <br /> <br />3. The east adjacent parcel is also zoned IC. East of that parcel is a parcel within the City of Salem. Both of these are <br />in similar industrial uses to the subject parcel. To the south of these parcels is an 11-acre field within the City of <br />Salem and adjacent to Mill Creek. This field north of Mill Creek is part of a larger 390.5-acre parcel within the <br />City of Salem’s planning jurisdiction that formerly housed a reform school and rehabilitation center. There are <br />plans to develop this parcel for residential purposes. To the west of the subject parcel, across the railroad and <br />Eastland Ave SE, are two parcels split zoned IG (General Industrial) and UT-10 (Urban Transition). The area <br />south of Boone Rd SE and west of Eastland Ave SE is all a mix of UT and IG, within the UGB of Salem. The <br />subject parcel lies in the northeastern section of this unannexed area south of Kuebler, most of which is <br />designated Industrial in Salem’s Comprehensive Plan. <br /> <br />4. The applicant proposes to establish a 40x60-foot shop for fabrication of cell tower components. <br /> <br />5. Marion County Planning requested comments from various agencies, those that provided comments are: <br /> <br /> Marion County Building Inspection commented: “Permit(s) are required to be obtained prior to structure <br />development and/or utilities installation on private property. An item to address in the architectural plans is the <br />proposed storage system layout, materials quantities, storage methods, materials use, and processes within the <br />building for fire and life safety concerns. Discussion with a building plans examiner is highly recommended <br />during plans design and prior to application submittal.” <br /> <br /> Marion County Septic commented: “An authorization is required to connect a new structure to the existing septic <br />system. An application/major alteration to increase the number of employees from 6-12 and attach the structure to <br />the system was received on 10/15/24.” <br /> <br /> Turner Fire District provided comments that are included in the case file and were provided to the applicant. <br /> <br />All other contacted agencies either failed to comment or stated no objection to the proposal. <br /> <br />6. The purpose of the Floodplain Overlay Zone is to promote public health, safety and general welfare to minimize <br />public and private losses due to flood conditions. In order to ensure that the development is reasonably safe from <br />flooding, the County requires the development to comply with the criteria and standards listed in Section <br />16.19.130 and 16.19.140 of the Marion County Code (MCC). <br />
The URL can be used to link to this page
Your browser does not support the video tag.