Laserfiche WebLink
APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision <br />to a Marion County hearings officer. The applicant may also request reconsideration (one time only and a $250.00 fee) on <br />the basis of new information subject to signing an extension of the 150-day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form <br />available from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, <br />Salem by 5:00 p.m. on November 29th, 2024. If you have questions about this decision contact the Planning Division at <br />(503) 588-5038 or at the office. This decision is effective, December 2nd, 2024, unless appealed. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />1. The subject property is designated Special Agriculture in the Marion County Comprehensive Plan and <br />correspondingly zoned SA (Special Agriculture). The primary intent of both this designation and zone is to <br />promote and protect small farm operations or areas with a mixture of good and poor farm soils. <br /> <br />2. The subject property is located just outside the City of Turner’s southeastern urban growth boundary, <br />approximately 330 feet east of the intersection of Witzel Road SE and Marion Road SE. The property is set back <br />approximately 150 feet north of Marion Rd SE and is accessed by an easement over tax lot 2600. This easement <br />serves at least two other adjacent lots. Current aerial imagery suggests that the subject property is actively <br />accessed using this easement. The property contains an old dwelling that is in disrepair and a barn. <br /> <br /> The subject parcel is described in its present configuration in a February 19, 1959 deed (Volume 519, Page 733), <br />and a November 20, 1959 deed (Volume 528, Page 887) and a subsequent November 21, 2013 deed (Reel 3562, <br />Page 400) which also describes a parcel of land as a non-exclusive 20-foot easement on the easternly line. The lot <br />is therefore considered legal for land use purposes. <br /> <br />3. Surrounding land uses consist mainly of small acreage residential properties with single family dwellings and <br />related accessory buildings. To the immediate south of the subject property, one lot is currently operating as a <br />religious organization. Across Marion Rd SE the uses are small acreage residential homesites in the SA zone and <br />to the west is the City of Turner where the land is being utilized as single family residential and religious <br />institution use. To the north and the east of the subject property the uses become increasing larger residential uses <br />and evidence of farming and forestry related uses <br /> <br />4. The Soil Survey of Marion County Oregon tool indicates that approximately 100% of the subject property soils <br />are high value soils. <br /> <br />5. The applicants are proposing to construct a replacement dwelling to replace the dilapidated dwelling and place the <br />new dwelling outside the identified 100-year floodplain. <br /> <br />6. Various agencies were contacted about the proposal and given an opportunity to comment. All contacted <br />agencies either failed to comment or stated no objection to the proposal. <br /> <br />Marion County Public Works Land Development, Engineering and Permits (LDEP) commented: <br /> <br />ENGINEERING REQUIREMENTS <br />A. At the time of application for building permits an Access Permit will be required to document the <br />legal access location in PW Engineering access records. <br />B. Transportation System Development Charges (TSDCs) and Parks fee will be assessed at the time <br />of application for building permits. <br />C. Utility service extensions such as electric power originating from within the public right-of-way <br />require permits from MCPW Engineering. <br />