Laserfiche WebLink
EXHIBIT B <br /> The Marion County Board of Commissioners adopts the following conditions in CP/ZC/PLA 21-001: <br /> EXPIRATION: This partition is valid only when exercised within two years of the effective date unless an extension is <br /> granted. The effective period of this approval may be extended for one year subject to approval of an extension. <br /> Request for an extension must be submitted to the Planning Division prior to expiration of the approval. (Extension <br /> forms available from the Planning Division). <br /> Planning Conditions: <br /> 1. Property line adjustment deeds shall be recorded with the county clerk meeting requirements in ORS <br /> 92.190(4). The deeds shall contain the names of the parties, the description of the adjusted lines, references <br /> to original recorded documents and signatures of all parties with proper acknowledgement. The deeds shall <br /> include a perimeter description of each resulting parcel. This property line adjustment is not complete until <br /> the title transfer instruments accomplishing the property adjustments are recorded by the applicants with <br /> the Marion County Clerk. <br /> 2. Prior to recording the property line adjustment deeds, the applicant shall have the parcels surveyed per ORS <br /> 92.060(7). The survey shall be filed with the County Surveyor and shall contain the notation that the survey <br /> is the result of CP/ZC/PLA 21-001. <br /> 3. Prior to recording the deeds, the applicants shall obtain any septic review and/or evaluations that may be <br /> required from the Marion County Building Inspection Division. <br /> 4. The resulting parcels shall significantly conform to the site plan submitted with the proposal. Minor <br /> variations are permitted upon review and approval by the Planning Director. <br /> Engineering Conditions: <br /> 1. Obtain final inspection approval for stormwater system improvements on existing TL 400 issued under <br /> Permit ST16-008. Also, design, permit, and construct additional stormwater system improvements, as may <br /> be required for already constructed surfacing on TL 600. The applicant must provide designs within 90 days <br /> of final approval and complete improvements within 180 days of final improvement, or as agreed to by <br /> Marion County Public Works. <br /> 2. Design, permit, and construct stormwater system improvements for TL 800 proposed building expansion, <br /> and including already conducted surfacing on TL 600. The applicant must provide designs within 90 days of <br /> final approval and complete improvements within 180 days of final improvement, or as agreed to by Marion <br /> County Public Works. <br /> 3. Obtain an Access Permit to document and make any required modifications, such as paving, to access <br /> approach work already conducted in front of TL 600 as part of the TL 800 operation expansion. <br /> 4. Dedicate right-of-way half-width on Shank Road expanded frontages of TL 400 and 800 to meet the local <br /> standard of 30 feet.The dedication must be made in conjunction with the property line adjustment. <br />