Laserfiche WebLink
, <br /> 7 7`yn q y ,� 5 a r w �-��im +K v LEZflow <br /> August2018 <br /> Under Oregon Administrative Rule(OAR)340-071-0117,(2005 FILTRA <br /> Revised OAR 340-071-0135), Infiltrator Water Technologies <br /> has received approval from the Oregon Department of Envi- Installation Instructions <br /> ronmental Quality(DEQ)to install the EZflow 1201 P configura- for EZflow S stem$ ' - r <br /> tion in the State of Oregon. The DEQ has also approved vari- Y �_ <br /> ous EZflow products for use in Standard Disposal Trenches, on •T `_ <br /> in Ore L � �� <br /> Capping Fill Systems, Sand Filter Systems, Seepage Trench 9 1 Fz <br /> Systems, Steep Slope Systems, Curtain Drains, Tile Dewater- -� <br /> ing Systems, and Pressurized Distribution Systems. • <br /> ti <br /> Materials & Equipment Needed <br /> . <br /> • EZflow Bundles ' „ ' ,, :;, <br /> • <br /> �Y yam, <br /> • EZflow barrier Paper or DEQ approved geotextile on .' f <br /> non-GEO products only Gn4 's '� ;z <br /> • EZflow Internal Pipe Couplers ,' <br /> • <br /> 3� , g • <br /> • Pipe for Header and Inlet <br /> • Backhoe <br /> • Laser,Transiton <br /> Installation Instructions 6. Place EZflow bundle(s)in the EZflow configuration <br /> The instructions for installation of EZflow products are given per permit.The top or center-most bundles containing pipe <br /> below. EZflow products must be installed in accordance with are joined end to end with an internal pipe coupler.Any <br /> OAR Chapter 340, Divisions 071 &073, as well as the DEQ additional aggregate only bundles,should be butted against , <br /> or local unit of government with jurisdiction. the other aggregate-only bundles and do not require any <br /> type of connection. <br /> 1.After the DEQ or local unit of government with jurisdiction <br /> has determined sizing, configuration, and layout for the 7. Header or lead lines from the distribution/drop box or <br /> EZflow system, stake or mark with paint the location of device will be connected to top or center-most pipe bundle <br /> trenches and lines. Set tank, invert pipe, header line or in each trench or inserted into pipe. <br /> distribution box and trench bottom elevations before <br /> installation of pipe bundles. 8.The EZflow drainfield systems should be installed in a <br /> level trench in all directions(both across and along the <br /> 2.The proper elevation of solid PVC effluent pipe going to trench bottom)and should follow the contour of the ground <br /> each trench should be determined to ensure compliance with surface elevation (uniform depth),with all continuous, <br /> the required maximum trench bottom depth as shown on the adjoining 10-foot bundles placed end to end,with central <br /> approved permit.This trench depth may vary depending on bundle distribution pipe connected. <br /> system height and configuration used. <br /> 9. EZflow bundles are flexible and can fit in curved trenches <br /> 3. Remove plastic EZflow shipping bags prior to placing as may be necessary to avoid trees, boulders, or other <br /> bundles in the trench(es). Remove any plastic bags in the obstacles. <br /> trench before system is covered. <br /> 10. Final contours and landscaping should be done in a <br /> 4.The top of each 1201 P-GEO and 1202H-GEO bundle manner to promote surface water runoff. <br /> contains a geotextile pre-inserted between the netting and <br /> aggregate.The geotextile is present to prevent soil intrusion Repeat steps 1 thru 10 for each required trench. <br /> and shall be placed facing upward. If using the 1202H-GEO, <br /> the bundles shall be placed with the geotextile on top and in As required by state or local regulations, be sure to obtain <br /> contact with the geotextile contained in the adjacent bundle proper installation inspection from the DEQ or local unit of <br /> before backfilling. government with jurisdiction prior to covering the system. <br /> 5. For EZflow products not containing GEO, only the top of After the system has been completely covered,vehicular <br /> the upper bundle should be covered with 60 lb. untreated traffic across or along the trenches shall be avoided. <br /> building paper available from EZflow. Other material such as <br /> DEQ approved geotextile may be used.A geotextile cover is <br /> necessary in sandy soils. <br /> Contact Infiltrator Water Technologies'Technical Services Department for assistance at 1-800-221-4436 <br />