Laserfiche WebLink
Onsite Permit 555-23-003927-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555091068845 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> latex 3, ° , :x ` " � .p rat ort rfat+ <br /> Work d tionjM fi D S D w 4rt ., <br /> Min depth: 24 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Other special rqmt: Drainfield must meet 100 ft setback to lake <br /> Conditions of approval <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building,electrical,or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> -A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank <br /> before connecting to the distribution unit. It must be installed with a minimum fall of 4 inches <br /> per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In addition, <br /> there must be a minimum difference of 8 inches between the invert of the septic tank outlet <br /> and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal <br /> distribution absorption field. <br /> -Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and <br /> bedded. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> 8/7/24:10:26:03AM ONS_OnsitePermitpr <br />