Laserfiche WebLink
Onsite Permit 555-23-003927-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555091068845 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> ,�� v� �' ��`� �* a�, /�v.,w' Fib �yp � vl'� *,�» - ��� -� <br /> mate iss d 8/23/2 ���_, ; ration d / 4 <br /> des ri n MA.[ RM' FD � <br /> �_ moo, „ ..,ems. ,...p,_� Ara ... ,,,,� �, ra ,.. a te < F.. 40044,144 ..� .. »_ '�..' <br /> Min depth: 24 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Customer oversizing drainfield for future expansion <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> 'All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> .Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location <br /> or specifications without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel.Pump wiring <br /> must comply with applicable building,electrical,or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green Color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank <br /> before connecting to the distribution unit. It must be installed with a minimum fall of 4 inches <br /> per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In addition, <br /> there must be a minimum difference of 8 inches between the invert of the septic tank outlet <br /> and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal <br /> distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and <br /> bedded. <br /> .Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> 8/23/23:9:20:37AM ONs OnsitePermitpr <br /> 1 <br />