Laserfiche WebLink
Onsite Permit 555-21-009198-PRMT-01 Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555002526213 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued Th9! .� /' y° �y ` � �pTrafiOn tla / S <br /> 0,449i1 hon FIRS 1 REP pRi~A HQ 019 1 C NtI <br /> - _. "°`n. va` '� w '?�asY�B �zs „.. .. ..... ... ... <br /> Special Requirements <br /> Stake out required: Yes <br /> Groundwater type: Not Applicable Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Other special rqmt: ELECTRICAL FINAL AND TANK ABANDONMENT FORM REQUIRED FOR FINAL <br /> Permit issuance under House Bill 2289 and Reasonable Repair Rule OAR 340-071-0215(4)(b) <br /> Conditions of approval <br /> •This repair permit is for a new septic system including a new tank and 60 feet of seepage trench. <br /> •This repair permit is being issued under Oregon House Bill 2289 and the reasonable repair rule OAR <br /> 340-071-0215(4)(b). <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, <br /> Building Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •AII roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Header pipe from Distribution or Drop Box must be minimum 4-ft length,level,and bedded. <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •AII work is to conform to OAR 340,Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 7/19/22:8:15:10AM ONS_OnsitePermitjr <br />