Laserfiche WebLink
Onsite Permit 555-23-001897-PRMT-01 Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555049773611 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting"in the app store <br /> Date issued: 3/29/23 Expiration date:3/28/24 <br /> Work description: FIRE MAJ REP 2 BDRM SFD TO REPL 2 BDRM <br /> Special Requirements <br /> Stake out required: No <br /> Pump to drainfield reqd: Yes - Filter fabric on top of drain media: N/A <br /> Other special rqmt: tank abandonment form with pump receipt required to final installation . <br /> Conditions of approval . <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> • <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep..Thirty-inch minimum diameter if greater than • <br /> 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes.An electrical permit and inspection from the <br /> Department of Consumer and Business Services, Building Codes Division, or the municipality with <br /> jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. . <br /> • <br /> • <br /> • <br /> 3/29/23:3:05:04PM ONS_OnsitePermit_pr <br />