Laserfiche WebLink
Onsite Permit 555-24-004498-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555021071032 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date.issued 81:5f 1154"` ? $ E cp r t nrdate #5/25 <br /> Wo t..de scripa%btio .., ..,,.�iR��,E B <br /> ORN a. .".,. RE iDR HOM= y. ., , ... , 0 <br /> "°•", ,4„0 ' f g ." i yq ,, w a ` <br /> 0-,� <br /> Media type description: EZ flow <br /> Trench length: 80 linear ft. Rock above pipe: N/A <br /> Max depth: 42 in. Undisturbed soil between trenches: 8 ft. <br /> Min depth: 40 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Conditions of approval: <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> -A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Equal distribution,all trench bottoms must be at the same elevation.Use Distribution <br /> box(es). <br /> 8/15/24:3:11:04PM ONS_OnsitePermit_pr <br />