Septic Permit 555-24-004498-PRMT Page 2 of 3
<br /> Date c.•ate lsstte $/28/Z{}24 ��, e' t t :;t:
<br /> .PC1yt! IitfV 313 T�R:F t4 I C3 tMM 19,. :;�
<br /> x.? � �*,�*� �^� � 0 3 �y✓Fl -�G �� �, � ,�v � a
<br /> �.'�, ,.�44 ,4044S. .4r�`ww���%.�u�...�.�' 4,a: re� aS;
<br /> i a x, onti[Ei ff34 ��
<br /> � �'�.s,.3`�:.. ...:.._.. ..., a _�� xi,,a� ,�,�
<br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent).
<br /> •The system must be installed by the property owner or a licensed sewage disposal business (installer).
<br /> •Vehicular traffic and livestock must be restricted from the system area.
<br /> •All roof drains must be directed away from the system
<br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-
<br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.
<br /> Maintain access to septic tank for pumping and service.
<br /> .Meet all required setbacks
<br /> •The system must be installed in the area approved during the site evaluation and in accordance with the
<br /> construction plan approved by the agent, including any changes made by the agent.
<br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or
<br /> specifications without approval by the agent.
<br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply
<br /> with applicable building, electrical, or other codes.An electrical permit and inspection from the Department
<br /> of Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is
<br /> required for pump wiring installation.
<br /> •Install the pump and system components in accordance with the approved pump curve and
<br /> specifications.
<br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on
<br /> top of the effluent sewer or pressure transport pipe from tank to drainfield.
<br /> .Each drainfield trench must be level within a tolerance of plus or minus 1-inch.
<br /> •Equal distribution, all trench bottoms must be at the same elevation. Use Distribution box(es).
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect
<br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance
<br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or
<br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment
<br /> of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the
<br /> issuance of this Certificate of Satisfactory Completion.
<br /> ' : . j. Gertl is to of Sate s_,F Completrap ,„Itmkte week .. e . `, . ... ...., : -4
<br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No
<br /> Comments: If the control panel is moved during construction it will need to be inspected by an electrical inspector prior to
<br /> Certificate of Occupancy.
<br /> so ,,4 x G+p�npteted,lrctcons��� ,. s 8/29/24:9:19:37AM ONS_OnsiteCSC_pr
<br />
|