Laserfiche WebLink
Septic Permit 555-24(-002904-PRMT Page 2 of 3 <br /> iota Gerttflcate ISSlied 0812912t}24 dp d l 4 <br /> Work I escnpttariN J REP a BDFtM 4 q4 4 4 fJ y� f x�� <br /> ai:10";,e WE .� .- a. ,�., �, ,u Gondtftak flf AP 9Y4! r 4t,r,olog <br /> •A pre-cover inspection of the installed absorption facility(prior to backfill)is required. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> . Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the distribution unit. It <br /> must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In <br /> addition,there must be a minimum difference of 8 inches between the invert of the septic tank outlet and either the invert of the <br /> header to the distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to the distribution <br /> pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> •Groundwater Interceptor, Curtain Drain required: Minimum trench width 12-inches.Minimum perf pipe diameter 4-inches; must <br /> meet the requirements in OAR 340-073-0060(4);and must be installed at least 2 inches above the bottom and along the full length <br /> of the trench with a minimum of 10 inches of drain media cover The curtain drain must be filled with drain media to within 12 inches <br /> of the ground surface with filter fabric placed over the media.The outlet pipe(s)must be rigid smooth-wall,solid PVC pipe meeting <br /> or exceeding ASTM Standard D-3034 with a minimum diameter of 4 inches.A flap gate or rodent guard must be installed.The <br /> curtain drain must extend at least 6 inches into the layer that limits effective soil depth or to a depth adequate to effectively dewater <br /> the site. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> A x T l a' .> ��na ' i fi ,r. ` ti r, , <br /> Certt of Satlg'fadt4 t'ytCompl trbn �, : F��` f � � ��� � <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> 8/29/24:1:22:57PM ONS_OnsiteCSC pr <br />