My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12354860
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12354860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 1:31:50 PM
Creation date
8/30/2024 9:18:30 AM
Metadata
Fields
Template:
Permits
Permit Address
450 NORTH SANTIAM HWY
Permit City
Gates
Permit Number
555-24-002271-AUTH
Parcel Number
093E27DA00400
Permit Type
Authorization
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oregon Department of Environmental Quality <br /> • Dosing tank capacity (gallons) <br /> • Tank volume determined by: Check all that apply, add comments below as needed <br /> ❑Permit Records❑Measured❑ Stamped on Tank❑ Other <br /> • Dosing tank material <br /> • Dosing tank appears to be watertight and in good condition ['Yes ❑No <br /> • Dosing tank lid is intact ❑Yes ❑No <br /> • Electrical components are sealed and watertight ❑Yes ❑No <br /> • Pump/siphon is functional EYes ❑No <br /> • Type of Pump ❑Demand dose ['Time dose <br /> • Pump control mechanism is functional(floats,pressure transducer) ❑Yes ❑No <br /> • There is a high water alarm❑Yes ❑No <br /> • The high water alarm(audible and visual)is working ❑Yes ❑No ['Not Applicable <br /> • Type of screen <br /> • Screen is clean and free of debris❑Yes ❑No-Screen cleaned for this evaluation❑Yes ❑No <br /> • Scum/sludge present in Dosing tank ❑Yes ❑No <br /> • Scum layer (inches) Sludge layer (inches) <br /> • Additional Comments: <br /> 5. Soil absorption system <br /> The soil absorption system is a set of trenches that receives effluent from the septic tank and <br /> filters the effluent before it enters the groundwater. <br /> • The septic system has a soil absorption system Yes ENo ❑Unknown <br /> • Was the soil absorption system part of the evaluation?121Yes ❑No ❑See note below <br /> If the soil absorption system was not evaluated,please explain below(for example unable to <br /> locate, client did not authorize this part of the evaluation): <br /> • Absorption distribution ®Equal ❑Serial ❑Pressure ['Equal via pressure <br /> • Absorption lines construction material: <br /> ZI Gravel and pipe ❑ Chamber ❑Tile ❑Polystyrene foam and pipe ['Other <br /> • Absorption distribution unit(s): ❑dropbox❑hydrosplitter Zequal distribution box <br /> Intact ❑Damaged ❑N/A <br /> • Absorption distribution unit(s)are free of debris or solids ❑Yes [ZINo ❑N/A <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.