My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12349395
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12349395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2024 3:36:59 PM
Creation date
8/28/2024 10:54:46 AM
Metadata
Fields
Template:
Permits
Permit Address
118 NORTH SANTIAM HWY
Permit City
Gates
Permit Number
555-24-003030-PRMT
Parcel Number
093E27DA01800
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-24-003030-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555023464520 <br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store <br /> I]ate ed 8"1/ s m w ' ? "' � 2 a 7 'd .' ¢ a F «a ratio !a )3/12' <br /> '�° � ,3, "° �'! � .�, ®�¢ F� � x fig,�Y '�� ,„ <br /> e criptiian FI RE 2 'ITa REP1 # M ` `` , a ° �g; <br /> �,d �' �° °' 4 u `� "'�a *' ;�Se�"'a° - "k°��a. .w�,�0° fig,°°�9 „ � it .� -�, �J a Aa <br /> Total rock depth: 12 in. Rock below pipe: N/A <br /> Max depth: 12 in. Undisturbed soil between trenches: N/A <br /> Min depth: 12 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: compacted gravels removed,install 12 inches into native with additional new 12 inches of native soils capped <br /> over system,will require Operation and Maintenance agreement for the life of the system <br /> Conditions of approval <br /> Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral <br /> piping with acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less <br /> than 10%variation. <br /> Piker fabric required over drain media(rapidly permeable soils). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system.The maintenance <br /> provider must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •AII roof drains must be directed away from the system <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> .Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> -For product approval information and manufacturer installation requirements see DEQ <br /> website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical,or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 8/1/24:12:38:49PM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.