Laserfiche WebLink
Septic Permit 555-24-003030-PRMT Page 2 of 3 <br /> 0:4 4 tf E"iE. tL Issc d' 08/26f204 1;�r d z ° 0xik,+ P p �� <br /> �` ''�'?� t�'a � h t� 'ks��.,,...«��h`.' a�i ..* �°�;. °;a�s> .,�s" �.� z�`�����e� # � „+7' '� °€,� .�s p d� ,r <br /> ttan 6M FfR�tAA,t REPBDI�MOR1PL2 SDRit�P <br /> g� �F•`'�, �fA° � u^�� � � � & ;• , <br /> ..rs,.�i'i,, '��a�,. .� � -�r��, � � `� '', ,; >�. K4 '.., . .:�. <br /> MEa ` ' sawsi,yFA i a, rOn{ItLa 1e�„fccr, .,es"s:: .-.`:.: , e. <br /> -Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> -Filter fabric required over drain media(rapidly permeable soils). <br /> -The owner of a pressurized distribution system must maintain a contract with a certified maintenance <br /> provider to inspect, adjust and maintain the onsite system.The maintenance provider must submit an <br /> annual report and annual evaluation fee. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty- <br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. <br /> Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> -For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply <br /> with applicable building,electrical, or other codes.An electrical permit and inspection from the Department <br /> of Consumer and Business Services, Building Codes Division, or the municipality with jurisdiction, is <br /> required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> -A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on <br /> top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic,livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> x `v a'`; i iZ '"O a'�r Vr' . . "�"'�, aje k Saf��actot�EampCettetrr `�. `�... � <br /> 8/26/24:2:24:08PM ONS_OnsiteCSCJr <br />