My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12337716
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12337716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 9:44:06 AM
Creation date
8/23/2024 3:08:22 PM
Metadata
Fields
Template:
Permits
Permit Address
4396 VIEWCREST RD S
Permit City
Salem
Permit Number
555-24-005464-PRMT
Parcel Number
083W08BC01400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-24-005464-PRMT Page 2 of 3 <br /> lien cerli ti to e ss tifei a i <br /> ,� � <br /> io 8:1* w 1, 4V.: :• zaY <br /> 4t & <br /> • �p („, FN.wb.,• <br /> COnioniospera <br /> -Properly decommission the old septic tank and submit appropriate documentation. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> -Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the distribution unit.It <br /> must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In <br /> addition,there must be a minimum difference of 8 inches between the invert of the septic tank outlet and either the invert of the <br /> header to the distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to the distribution <br /> pipes of an equal distribution absorption field. <br /> -Header pipe from Distribution or Drop Box must be minimum 4-ft length,level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> • <br /> -Serial distribution,each trench bottom to be level and on contour.Use Drop box(es). <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340,Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic,livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340,Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> C@ C IA O °A GRAIA1 .'�n .. <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: COSC Issued Ok to cover and connect <br /> ' .� ��' �^"� <br /> j, v <br /> th5.3l+- .r ... <br /> 8/22/24:9:40:23AM ONS_OnsiteCSC pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.