• <br /> Capping Fill System Diagram <br /> • <br /> • <br /> e 10 feet minimum _ • • <br /> 10 feet minimum -r- <br /> \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ <br /> \\\\\\\\\\\\\\\\\\\\\\\ Fill -10 to 16 inches depending on distribution technique .\\\\\\\\\\\\\\\\\\\\v\\ <br /> 4Pir <br /> III , 12" trench depth <br /> 0#;:i <br /> ;Ala' Original ground d <br /> ph`• <br /> A7i <br /> • Drain Media surface <br /> • <br /> Capping Fill Construction Requirements <br /> Construction Requirements: The cap shall be constructed in accordance with permit requirements. Unless otherwise required _ <br /> • - - , the construction sequence shall be as follows. • <br /> a. Construction of capping fills may only occur between June 1 and October 1 unless otherwise allowed. The upper twenty-four • <br /> inches of soil must not be saturated or at moisture content which causes loss of soil structure•and/or porosity when worked. <br /> b. The fill material must be compatible with the native topsoil on the site. The fill soil must be,examined and approved by a <br /> sanitarian from our office prior to placement on the drainfield site. • • <br /> c. .The drainfield site and the borrow site must both be scarified (plowed or disced) to destroy the vegetative mat. <br /> d. Apply fill to the drainfield site and work in'(rototill) so that the two contact layers (native soil and fill) are incorporated. Evenly grade <br /> fill material to a final depth of 10"for equal distribution or 16"for serial distribution: This will result in a six or twelve inch settled fill depth. <br /> e. ,Install drainfield as specified in construction permit. There must be a minimum of 10 feet separation between the edge of the fill <br /> and the nearest trench sidewall. <br /> . f. ' Following inspection and.approval, backfill the trenches carefully. The site must be planted with grass, and protected from <br /> livestock, automotive traffic, or other activity that would damage the system. . <br /> Required Inspections: The following minimum inspections must be performed for each capping fill installation. . <br /> a. Both the drainfield site and the borrow material must be inspected for scarification, soil texture, and moisture content prior to • <br /> cap construction. <br /> b. 'After the cap is placed, an inspection must be made to determine that there is good contact between fill material and native • <br /> soil (no obvious contact zone visible), adequate depth of material, and uniform distribution of fill material. <br /> c. A pre-cover inspection of the installed drainfield must be made. A completed "as-built" record of the installation must be <br /> submitted with the request for this inspection. <br /> d. A final inspection must be made after the system has been backfilled, finish-graded, and seeded. A Certificate of Satisfactory <br /> Y 9 <br /> completion may be issued following this inspection. <br /> NOTE: The_system installer is responsible for final backfilling and grading of the system. The property owner is responsible for establishing a <br /> vegetative( •er within 30 days of the final grading of the cap. <br />