Laserfiche WebLink
Marion County <br /> 5155 Silverton Rd NE <br /> Marion Septic Site Evaluation Salem,OR 97305 <br /> p <br /> County 503-588-5147 <br /> Building@co.marion.or.us <br /> a;E:G.ON <br /> --- Website:co.marion.or.us <br /> 555-24-006064-EVAL <br /> a at ev rup.ation dented'08/08/2024 � �� s� G <br /> •ppitcatio •,•. a", ,� <br /> o nption SE I EMPLOYEESr , ; *, <br /> e ,P„ `� eat' ��a �` 6 'r ; � av,41,04, v P $«�e <br /> 411.7' -- <br /> Applicant: Oregon Sewer&Drain Primary contractor:Oregon Sewer&Drain <br /> Address: PO Box 1282 Installer/Pumper License:38968 <br /> Silverton OR 97381 Address: PO Box 1282 <br /> Phone: 5038749414 Silverton OR 97381 <br /> Email: josh@oregonsewer.com Phone: 5038749414 <br /> Email: josh@oregonsewer.com <br /> Owner: HOUCK, ROY L&HOUCK,ALLISON Property address: 5175 Eastland Ave SE,Salem,OR <br /> K 97317 <br /> Address: 4444 22ND AV NE <br /> SALEM OR 97303 <br /> Parcel:082W18B 01300-Primary <br /> Lot size: 7.19 Acres Water supply: Well <br /> Zoning: N/A City/County/UGB: N/A <br /> Accessory Dwelling Unit: No <br /> Proposed use of structure: Office with 12 Employees <br /> Category of construction: Commercial <br /> Gene t*PecnFlra 74s, <br /> Max peak design flow: 180 gpd. Proposed gallons per day: 90 gpd. <br /> Min septic tank volume: 1500 gal. Min dosing tank volume: N/A <br /> Special tank reqmts: A holding tank may be permitted for use under OAR 340-071-0340(1)(a) <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report,plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable,burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 8/8/24:8:44:04AM Page 1 of 2 ONS_OnsiteEvaluationjr <br />