My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12312173
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12312173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 10:36:04 AM
Creation date
8/9/2024 11:33:01 AM
Metadata
Fields
Template:
Permits
Permit Address
11484 HAZELGREEN RD NE
Permit City
Silverton
Permit Number
555-22-004283-PRMT
Parcel Number
061W32 00901
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County Onsite Disposal System Fee Schedule <br /> Effective September 1,2015 <br /> Marion DEQ .' Total Fee <br /> New Site Evaluations ; ly,. y <br /> County Fee Surcharge Surchar e <br /> g <br /> Single Family Dwelling -First Lot $625 $100 $725 <br /> -each add'l lot evaluated during initial visit $575 $100 $675 <br /> Commercial Facility.System-First 1,000 Gallons $625 $100 $725 <br /> -Each Additional 500 Gallons $120 ' - $120 <br /> Total Fee <br /> Construction Installation Permits Fee DEQ w/DEQ <br /> Surcharge aSurcharge::. <br /> Standard System,Redundant System, Saprolite, Seepage Pit, Steep $750 $100 $850 <br /> Slope <br /> Alternate Treatment Technologies,Capping Fill,Pressure Distribution, $990 $100 $1090 <br /> Tile Dewatering <br /> Sand Filter,Recirculation Gravel Filters $1200 $100 $1300 <br /> Gray Water Disposal Sump $290 $100 $390 <br /> Holding Tank $559 $100 $659 <br /> Major Repair . $600 $100 $700 <br /> Minor Repair $100 $100 $200 <br /> Major Alteration Permit $675 $100 $775 <br /> Minor Alteration Permit $175 $100 $275 <br /> Penult w/sewage flow> 1000 gallons per day in addition to above,per $75 - $75 <br /> 500 gallons per day . <br /> Pump System-in addition to permit fee $50 - $50 <br /> Permit Renewal-Field Visit $336 $100 $436 <br /> Permit Renewal-No Field Visit . $26 $100 $126 <br /> • Tqt, .. <br /> - • : -: - •• :: '• • -- : - . . : -..",:- -.: - ", ''••' ' ' -::-:.-:'.;- •S'' at Fee <br /> Commercial Plan Review Fee DEQ w/DEQ <br /> _. ... -.. .. , Surcharge', :Surcharge .:.' . <br /> Gallon/day=601 - 1000 Gallons $250 - $250 <br /> Each 500 Gallons per day above 1000 $50 - $50 <br /> Total Fee <br /> Other Onsite Activities Fee DEQ w/DEQ <br /> Surcharge _ Surcharge .-. <br /> Authorization Notice with Field Visit $450 $100 $550 <br /> Authorization Notice without Field Visit $150 $100 $250 <br /> Pumper Truck Inspection-First Truck $98 - $98 <br /> Pumper Truck Inspection-Additional Truck $50 - $50 <br /> Existing System Report $435 $100 $535 <br /> Mobile Hardship Renewal Inspection $264 $100 $364 <br /> Annual Report Evaluation Fee Holding Tanks/Alternate Systems $50 - $50 <br /> Alternate System Inspection Fee $341 - $341 <br /> • Hourly Inspection Rate $67.25 • - $67.25 <br /> Reinspection Fee $52 - - $52 <br /> Compliance Recovery Fee(For work done without permits)when Varies <br /> authorized by OAR.340-071-0140 is equal to the application fee. <br /> Record Review $47 - $47 <br /> Page2of2 <br /> I <br /> G:\FORMS\SEPTIC\S-01 ONSTTE.APPL SEPT 2018.DOCX Rev 1/15,3/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.