Onsite Permit 555-23-007984-PRMT Page 3 of 3
<br /> Schedule or track inspections at www.buildingpermits.oregon.gov
<br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555056756573
<br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store
<br /> r� .-> ��d j .s h�``��� .-� � � u u N`ye �"" �� -.,��° �y .� ��� x� � °°� � a.•� rFa,. >c
<br /> Date issued 3.t6124� 6 x €�`"•. . , ..g, p6 .: •`+, :.s� �
<br /> ti°� � �� A1��� � ��� � � �• <X�.� � � � s i �Y�°�� K ���� � � �f� �. � �,�f Expiratron�rafe 316/25
<br /> e 1{Y�r�h ( �.r &.:. a°`� ^s',. - y. V •5,s}` e` 5""a e A T a •r� s � ' �'`"�
<br /> yot ife tp04r[ F10 f1�..1= v, L� a"L"#.» �i � � ty�b_ �4 ,fi F.. �e pW 3f
<br /> v $ ,4 .fib m t ��v":.^ � r e?: 6%,,��' '"'`�dTAKA a ` s� "` 3h1 Hdfr
<br /> � • , .� .;
<br /> ...,� .,_,.,.«, ., d.*: >a max?..«,,. 4-..n d,,�Mp ,.. . `" ..;.:R,dA'"'�„ „1 ,,,, ... N.�`°^a,a ,✓.,I,"`r".T.... 9 „_, d'i"k s
<br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system
<br /> specified above.
<br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at:
<br /> http://www.deq.state.or.us/wq/onsite/onsite.htm
<br /> General Conditions And Requirements For All Permits:
<br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is
<br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received
<br /> before the permit expiration date.Reinstatement of a permit may be granted if an application for permit
<br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the
<br /> permittee to another person may be granted if an application for permit transfer is received before the permit
<br /> expiration date and no other changes to the permit are necessary.
<br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the
<br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas
<br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not
<br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the
<br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need
<br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in --
<br /> 340-071-0160(9).
<br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when
<br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the
<br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the
<br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection
<br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection
<br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final
<br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received
<br /> before a Certificate of Satisfactory Completion can be issued.
<br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting
<br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of
<br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been
<br /> conducted within 7 days of notification of completed installation).
<br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after
<br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The
<br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,
<br /> or other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or
<br /> other material approved by the agent is completely covering all drain media where required prior to backfill.
<br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has
<br /> been issued.
<br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated
<br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt
<br /> or concrete,filling,cutting,or other soil modifications.
<br /> Kimberlee Aldrich Onsite Wastewater Specialist 2 3/6/24
<br /> 3/7/24:8:30:11AM ONS_OnsitePermit pr