Laserfiche WebLink
Marion County Building Inspection Division <br /> On-Site Wastewater Fee Schedule <br /> The final determination of valuation,occupancy,and/or construction type under <br /> any of the provisions of this order shall be made by the Building Official. <br /> July 1,2022 July 1,2023 July 1,2024 <br /> New Site Evaluations <br /> Single Family Dwelling-First Lot $725 $810 $890 <br /> -each additional lot evaluated during initial visit $670 $750 $820 <br /> Commercial Facility System <br /> First 1,000 Gallons $780 $860 $940 <br /> Each Additional 500 Gallons $150 $170 $180 <br /> Construction Installation Permits <br /> Standard System,Redundant System,Saprolite,Seepage Pit, Steep Slope $1010 $1050 $1080 <br /> Alternate Treatment Technologies,Capping Fill,Pressure Distribution, $1320 $1440 $1550 <br /> Tile Dewatering <br /> Sand Filter,Recirculation Gravel Filters $1500 $1650 $1800 <br /> Gray Water Disposal Sump $360 $400 $430 <br /> Holding Tank $705 $760 $820 <br /> Major Repair $600 $640 $670 <br /> Minor Repair $305 $320 $340 <br /> Major Alteration Permit $745 $800 $850 <br /> Minor Alteration Permit $415 $440 $470 <br /> Permit w/sewage flow>1000 gallons per day in addition to above,per $90 $100 $110 <br /> 500 gallons per day <br /> Pump System-in addition to permit fee $60 $65 $70 <br /> Permit Renewal-Field Visit $420 $460 $500 <br /> Permit Renewal-No Field Visit $30 $35 $40 <br /> Other on-site activities <br /> Authorization Notice with Field Visit $605 $650 $700 <br /> Authorization Notice without Field Visit $205 $210 $220 <br /> Pumper Truck Inspection-First Truck $170 $180 $190 <br /> Pumper Truck Inspection-Additional Truck $90 $95 $100 <br /> Existing System Report $565 $610 $650 <br /> Mobile Hardship Renewal Inspection $330 $350 $370 <br /> Annual Report Evaluation Fee Holding Tanks/Alternate Systems $70 $75 $80 <br /> Alternate System Inspection Fee $430 $480 $520 <br /> Hourly Inspection Rate $70 $75 $80 <br /> Reinspection Fee $70 $75 $80 <br /> Compliance Recovery Fee—When authorized by OAR 340-071-0140— In addition to In addition to In addition to <br /> Not to exceed the permit application fee the permit fee the permit fee the permit fee <br /> Record Review $60 $65 $70 <br /> Commercial Plan Review <br /> Gallon/day=601 - 1000 Gallons $310 $340 $370 <br /> Each 500 Gallons per day above 1000 $60 $65 $70 <br /> State DEQ Surcharge As required As required As required <br /> by the State by the State by the State <br /> * Beginning July 1,2025,fees shall be adjusted annually based on the prior year's Consumer Price Index. <br /> Order No. 22-072 Exhibit A Building Inspection Fee Schedule Page 10 of 10 <br />