My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12293642
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12293642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 2:30:37 PM
Creation date
7/30/2024 2:34:17 PM
Metadata
Fields
Template:
Permits
Permit Address
5575 FRUITLAND RD NE
Permit City
Salem
Permit Number
555-23-005626-PRMT
Parcel Number
072W21CC03300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,,, ,,,, Marion County Date:8/18/2023 <br /> OREGON <br /> PUBLIC WORKS <br /> Marion County Onsite <br /> Wastewater Site Review <br /> Tax Lot# <br /> Address 5575 rr.:-'--J I Road NE, Salem <br /> 072W21 CC0300 <br /> Activity Major Repair <br /> Parcel Size 4.54 Acres <br /> Number 555- 23-005626 <br /> Completed by Aidan Bammes, REHS <br /> An evaluation of the test holes dug for soil analysis was conducted on 7/13/2023 <br /> The conditions observed during this site evaluation indicate that the area around the evaluated test <br /> holes IS NOT capable of supporting a standard septic system. <br /> Under these conditions a Alternative Treatment Technology Treatment Standard 1 <br /> system is required by Department of Environmental Quality (DEQ) rules. <br /> **Please refer to the attached soil notes form and onsite septic inspection map(s) for the location of the <br /> approved area and the minimum requirements for the proposed system.** <br /> This site approval is for a system design to serve a Church with 250 Seats & Baptismal Font <br /> The maximum daily flow into the system is 1967 gallons per day. <br /> The following documents are required to issue this permit (this checklist is for your own record keeping): <br /> nPlot Plan n Pump Curve <br /> ❑ Materials List n System Stakeout <br /> nProduct Specifications <br /> nOperation & Maintainance Contract <br /> **See Reverse for Notes or Special Conditions** <br />
The URL can be used to link to this page
Your browser does not support the video tag.